Answer Posted / rasika deshpande
By means of BOM usage, you can manage separate bills of
material for various internal organizational areas
(engineering/design, production, costing, and so on).We can
define different boms for the different areas of the
company, such as design dept, production, sells and
distribution etc. , depending on their individual
requirement. This can be done by choosing different usages
while creating the bom.
The BOM status specifies whether a bill of material is
active or inactive for different organizational areas.
it can be seen at header level of the bom.
| Is This Answer Correct ? | 13 Yes | 4 No |
Post New Answer View All Answers
What are traffic lights in mrp?
What is the use of QM control key?
Special Procurement type 40 – proc. form alt. plant
How to insert an inspection checkpoint at the end of an operation?
Which BOM item category you have used?
How to group employees for their allowances in payroll?
Difference between standard cost and variable cost.
What happens to plan after it has been converted into production order?
What is process keys
How mrp (material requirement planning) types are classified?
What is a ‘bom’?
Explain what happens to planned after it has been converted into production order?
Explain the stock requirement list and their uses.
list the important tables used in pp.
Explain Availability check.