Explain 'mrp' (material requirements planning)?
No Answer is Posted For this Question
Be the First to Post Answer
How you get the ticket?
What is MRP group?
which process is complex ? REM or Discrete manufacturing.
Do you have several alternative BOMs for a material, depending on the manufacturing procedure or lot size, for example (multiple BOM)?
Explain In-process inspection.
Suppose the client wants me the vacancy to be displayed on a website as well as ess. How should I do it?
What is the configuration done for Order type dependent parameter and confirmation parameter
What is Planning time Fence?
What is the difference between stock transport order and stock transfer order?
What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?
Difference between standard cost and variable cost.
What change management functions do you require? How do you want to define the validity of BOMs (based on date/freely definable parameters)? Must existing change histories be transferred to the R/3 System?