Tell bom header level & component level
The finished goods (Material) for which you are creating a BOM is called Header leve. for finished material if you have components like "A" and "B", this level is called 1st component level. if you have raw materials "c" and "d" for semi finished goods "A", this is called 2nd level BOM and so on.
Is This Answer Correct ? | 0 Yes | 0 No |
Can we use the same routine for materials undergoing the same process/operations? Can we avoid separate routing for each and every material produced?
Checkdigit example
what are the basics of PP ?
Can anybody explain to me why the work scheduling view is required for semi-finished and finished products?
We need to do gi of components to production order using back-flush. The component stock is managed in batches. The batch to be back-flushed?
what are the constraints of Variant configuration?
What is the transaction code to run MRP for sales order?
What happens to planned after it has been converted into production order ?
What is Individual and collective requirements and differecne between them in MTO scenario?
Mention what is the purpose of using capacity planning?
Special Procurement type 40 – proc. form alt. plant
Difference between MD04 and MD05.