Do you have several alternative BOMs for a material,
depending on the manufacturing procedure or lot size, for
example (multiple BOM)?
Answer / sunil budhwani
yes you can have several alternative BOMs for a material,
only thing is you need to define every BOM with deiffrent
product structure type.
Is This Answer Correct ? | 5 Yes | 0 No |
Can anybody explain to me why the work scheduling view is required for semi-finished and finished products?
What structure do your BOMs have? How many levels are there? How many components are there on each level?
What is SOP and types of SOP?
What is the difference between production version & variant configuration?
What happens to planned after it has been converted into production order ?
What are all the steps involved in Variant Configuration?
Different types of Object Dependencies.
Explain 'mrp' (material requirements planning)?
What are basic dates?
What is planned consumption and unplanned consumption?
What is time phased Planning?
If MRP type PD/ND in material master how will work flow.?