types of mrp?

Answer Posted / mahesh

PD : Mrp planning. explote the BOM upto last level and create the planned oder from finish product level to raw material level

MO : Master schedling planning : the BOM upto next level of the final product.so create the planned order for the final product and create depended reqmt for the next level material

MRp Type P1 or M1:
Ans: THe order proposal that lies within the planning time fence is firmed automatically as soon as its date lies at least one day before the finish date of the planning time fence. The date of new order proposals that are actually created in the planning time fence are rescheduled out to the end of the planning time fence. Therefore, these new order proposals are not firmed

MRP type P2 or M2:
Ans: An order proposal that lies within the planning time fence is automatically firmed as soon as its date lies at least one day before the end of the planning time fence. The system does not create any new order proposals within the planning time fence. That is, the shortage situation is not adjusted within the planning time fence.

MRP type P3 or M3:
Ans: Order proposals that lie within the planning time fence are not firmed automatically. The order proposals required to cover the requirements are moved to the end of the planning time fence

MRP type P4 or M4:
Within the planning time fence, the system creates no order proposals automatically. That is, the shortage situation is not adjusted within the planning time fence.

M4 is to classify the MS parts and P4 is for normal MRP items. BOm will be exploded in both cases to lower levels if procurement proposals created within or outside the time fence.

VB/VM - here , the system do not consider the reqmt (pir or sales order ) , it check the reorder level in the material master and create the planned orde / pr once the stock reach the level.

ND : no planning . so the material will not be consider for planning

XO : If you are going to do MRP planning the external . say APO or other you can use this type of mrp

Is This Answer Correct ?    4 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Control keys

1424


what do you mean by opening periods

594


Where have we to specify the teardown time in one operation?

591


Difference between base unit of measure, production unit, order unit

2628


What are all the steps involved in Variant Configuration?

1242






Question related to Production order status or status profile?

1035


What is testing & explain standard testing

1447


Define standard cost

712


How does sap know that an operation has components as indicated by the component allocation indicator?

554


In lsmw which is the most important step?

608


What is the use of QM control key?

2233


What is SOP and types of SOP?

1257


What is process keys

1469


Define mrp group

651


any one can provide me some sample resume for SAP PP with 0 to 1 year experience?

3553