Questions Answers Category Views Company eMail

which process is complex ? REM or Discrete manufacturing.

1 SAP PP (Production Planning) 3766




Answers / { ajit kumar }

Question { 2514 }

I have an Aspire 4710 notebook. few days ago I have formated my system and reload Windows xp home. and updated ita all driver / When i run movie - the visual are seeing blur Why ?? then i have installed intel media graphic driver also but its same as before.. pls advise the solution...thanks


Answer

you have not mentioned in which player you are watching movie. change the player like vlc,kmp etc. the problem may by solved

Is This Answer Correct ?    0 Yes 0 No

Question { Chembond Chemicals, 6548 }

What is full form of EANs in Basic Data 1?


Answer

EAN-International Article Number

Is This Answer Correct ?    14 Yes 0 No


Question { 2029 }

Tell bom header level & component level


Answer

The finished goods (Material) for which you are creating a BOM is called Header leve. for finished material if you have components like "A" and "B", this level is called 1st component level. if you have raw materials "c" and "d" for semi finished goods "A", this is called 2nd level BOM and so on.

Is This Answer Correct ?    0 Yes 0 No

Question { 2000 }

Tell me different mrp types


Answer

you can find mrp types in material master MRP1 view. the list consists of 1. Material requirement planning (MRP), 2. Master production schedule (MPS) and 3. Consumption based palnning.

Is This Answer Correct ?    0 Yes 1 No

Question { 2032 }

What is mrp procedure


Answer

MRP Procedure:
1. Material requirement planning.
2. Master production schedule.
3.Consumption based planning
3.a. Reorder point planning
3.b. Time phased planning
3.c. Forecast based palnning

Is This Answer Correct ?    1 Yes 0 No

Question { 1685 }

What are the strategy groups you have used?


Answer

Strategy group are like 10,11,20,25 so on.
This is a part of demand management

Is This Answer Correct ?    0 Yes 0 No

Question { 2182 }

What is REM or What is REM profile


Answer

REM profile is a master data for Repetitive manufacturing. tcode is OSP2.

Is This Answer Correct ?    0 Yes 0 No

Question { 3427 }

Can we create a production order without BOM and Routing?


Answer

YES, make the customization setting in OPL8.

Is This Answer Correct ?    4 Yes 0 No

Question { 5001 }

Once the Production order is created, how to change the BOM and routing in that order?


Answer

With reference to Mohamed Ibrahim's answer, after changing the bom/routing, go to production order menu in change mode and choose "read pp master data" then only the new bom/routing will be updated.

Is This Answer Correct ?    0 Yes 0 No