What is Replenishment lead time?
Answers were Sorted based on User's Feedback
Answer / rahu;
Total time for the in-house production or for the external
procurement of a product. In in-house production, the
replenishment lead time is determined to cover all BOM levels
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / mahendar
Replenishment Lead time is the time for material to become
available either from external procurement or in house
production.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / chitta
The time taken by the business to produce the material or
procure to make product available
Is This Answer Correct ? | 0 Yes | 0 No |
Answer /
It is a time taken process to make finished goods and dispatch
to the customer.
(Manufacturing time + Quality inspection time)
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / ashok reddy
It is the total time taken to manufactured the goods and make the goods ready for dispatch is known total replenishment lead time
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / dave
I have yet to see a correct answer. IT folks nearly always get it wrong. Some of the answers above are only correct in specific circumstances. People always miss the important of delivery/ship frequency. A transit and goods receipt time could be 7 days total. But if parts are being shipped from a supplier daily, the RLT for use in a formula, is 1 day. There will be 7 days of inventory in the pipeline. Not every material is Make to Order. It’s counter intuitive, but mostly just logic once understood.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / rajeshwaran
Its is the time taken to fill the the used stock. The fill
may be from supplier or through manufature
Is This Answer Correct ? | 3 Yes | 5 No |
Answer / mahesh
Srikanth is right..but If u r using Inhouse production time
then Planned delivery time is not applicable since planned
delivery time is used if u r procuring the material from
outside. We specify it as Procuremtn type in Material
Master.
Is This Answer Correct ? | 3 Yes | 9 No |
Answer / sailaja
Replenishment Lead Time is the difference between Stock
released from the picking location time - Stock replaced in
picking location time from stock reserved location time
Is This Answer Correct ? | 0 Yes | 8 No |
what is the account group?
2 Answers TATA, Yash Technologies,
In Third party if vendor direct deliever the goods to the customer or deliever the goods to the company then what would be the diff in this scenerio bcz of these two situation.
Can anybody tell me how can i generate the back order value?
What is condition supplement?
What do you mean by ASAP methodology? Explain in detail about the different phases / Stages in ASAP methodology? I have an interview in immediate future so plzz help me...Please reply asap... Urgent!!!! Waiting for your response eagerly... Thanks in advance
Can I assign Two Ship to Party in one customer?
Explain EDI and its usage?
When I am saving customer master (internal number range), system generating number range like 5000211,500216and 500221 instead of giving 500211,500212 and 500213.why system generating like this?
explain about minimum value surcharge calculated?
How to customise Excise duty, Insurance, cess condition type in Pricing procedure? Explain in detail
Explain the difference between SAP 4.7 and ECC 5.0?
Tell me the situation in ur project when u have seen need?