Answer / samir
it means tranfering requirement from BOM header material to
BOM items.
Is This Answer Correct ? | 7 Yes | 1 No |
Answer / abhijit guharoy
it is the process of multiplying the requirement by the
usage quantity and recording the appropriate requirements
throughout the product tree
Is This Answer Correct ? | 6 Yes | 1 No |
Answer / ajit kumar santi
A BOM Explosion answers the question of :- what is the product made of ? & we need BOM Explosion when we want to:-
a)Determine material Requirement for a product.
b)Look at the overall structure of a product in a design department.
c)See an overview of the parts & material required.
d)Calculate the effect of changes to cost.
Is This Answer Correct ? | 4 Yes | 0 No |
Answer / syed
Using gross-net calculation within material requirements
planning, a BOM explosion is carried out from the finished
product to the individual component.
Is This Answer Correct ? | 2 Yes | 0 No |
Answer / rahul
entry to be made- this much of Material B is needed to produce Material A.
Is This Answer Correct ? | 2 Yes | 5 No |
What are all the ‘technical types of bom’?
What is the difference between time ticket and time event confirmation and when they are used ?
Can you dispatch capacity for a single work center
What is scope of planning?
What is Schedule Margin key. How floats works in scheduling?
Explain the planning steps for 100 products?
what is the major ticket in your experience
• What types of scrap can be maintained in PP basic data and how would they be considered during MRP repectively scheduling?
Difference b/w Co-product & by-Product
Tell me deferent MRP types
How did you configure the payscale structure?
How do you integrate HR (employee) with PP?