what is the meaning of explodinG a BOM

Answer Posted / ajit kumar santi

A BOM Explosion answers the question of :- what is the product made of ? & we need BOM Explosion when we want to:-
a)Determine material Requirement for a product.
b)Look at the overall structure of a product in a design department.
c)See an overview of the parts & material required.
d)Calculate the effect of changes to cost.

Is This Answer Correct ?    4 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What change management functions do you require? How do you want to define the validity of BOMs (based on date/freely definable parameters)? Must existing change histories be transferred to the R/3 System?

1716


Integration between PP and QM Module.

1331


What are dynamic actions? Give a few examples. What are it’s you used in them?

574


Define gaps.

606


What is known as 'demand management'?

651






what is the major ticket in your experience

612


What are all the steps involved in Variant Configuration?

1241


Difference between plan cost, Actual cost and target cost.

2615


We have two storage locations are ‘0001’ and ‘0600’. Default storage location in process order is always ‘0001’ what determines this default location?

774


Splitting of production order & product version

1334


How to create opbject dependencies in a bom for a configurable material?

711


What do you do to run MRP for just one MRP Controller?

1083


What are traffic lights in mrp?

733


What is Individual and collective requirements and differecne between them in MTO scenario?

1588


What is plm (product lifecycle management) in sap pp and what is the use?

600