Answer Posted / rahul
entry to be made- this much of Material B is needed to produce Material A.
Is This Answer Correct ? | 2 Yes | 5 No |
Post New Answer View All Answers
We need to do gi of components to production order using back-flush. The component stock is managed in batches. The batch to be back-flushed?
What happens to plan after it has been converted into production order?
What is it 41 used for?
Define standard cost
Explain variant configuration
What is the purpose of using capacity planning?
Explain Flexible planning Procedure?
Explain the process of Material costing.
Explain the mrp group and their uses.
what are the constraints of Variant configuration?
You want to insert an inspection check point at the end of an operation. How would you do that?
What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?
What are sequence, parallel, overlapping, splitting and where can we assign these
Scheduling times can be defined in the material master record by?
What are the different type of BOM usage?