57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11
L&T,
9051What is the weight of 10mm,20mm,40mm aggregate per cubic metre in kg?
ABC Enterprise, Alstom, Badri Rai, IOCL, L&T, MICCO, NKC, PDC Construction,
8 74955Post New Civil Engineering Questions
1m square 20mm plastering how much of water need curing work
what is the procedure of wet seiving. n percentage of silt in different type of soil?
How many % we consider for lap for reinforcement for estimates
If 40 backlogs are cleared m finally with 65 percent marks . Am I eligible to get visa to US
what is the minimum cement content for M20 & M25 as per is code -456(2000).
if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel
How much 1 cum of M15, M20 & M25 concrete weigh?
what is called Bulk Density of aggregate?
Forces in a Shear Wall are in plane or out of plane ?
What does a construction cost covers and what does not?
How to build the floor to ceiling bookcase?
What is soil enforcement?
The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
What is the procedure of concealed plumbing in toilets?