What are some structures that are subjected to fatigue?

1 1134

Can inverted beams used in pipes during construction?

866

What is absolute pressure? How absolute pressure is calculated?

664

What you understand by building codes?

663

Explain moment of inertia and its importance.

649

Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.

688

What you understand by richter scale?

701

Can inverted beams used in pipes during construction? If yes, explain how it can be implemented?

876

How do we determine the specific gravity of a cement?

648

Explain major difference between auto level and dumpy level?

739

While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?

655

Minimum concrete cover in slabs, columns, beams, foundation and other st?

665

What in bending moment, if a moment is free end of cantilever beam?

708

Which purpose we use deck anchor in bridges?

632

When was the first motorway built in england?

644


Post New Civil Engineering Questions

Un-Answered Questions { Civil Engineering }

How to estabilish reinforcement Steel rolling margin for a building projects ?

3642


undistributed samples are obtained by

1981


What is meant by cartesian coordinate system?

703


how many kg cement & fine sand reqird in one sq meter 1:6 mortar ratio?

1980


CAN V USE CRUSH SAND FOR CLAY BRICK MASONARY

722






I have an span length 16 ft c/c

1055


In Rcc ratio calculation I wanted to know quantity of Steel also.

1112


Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????

1605


What will be weight of 0.5mm GI sheet per sq.ft?

16675


How to do bbs in excel format

1586


What is the density of Fiber reinforced concrete and give me the which fibers we can use in Concrete?

1587


1:4:8 pcc calculation 591 cu.ft

1795


What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?

2388


significance of specific surface area of particles?

1780


Which condition will prevail for the design of a swimming pool ? When the pool is empty or when it is filled ?

1956