Civil Engineering Interview Questions
Questions Answers Views Company eMail

how clculate excavated or backfilling quantity by simpson's rule

Jaypee,

4730

What is "Bending moment"? Demonstrate on theory not for formula.

3 6950

How to calculate the crank length of the rod in beam? Please give me a details.

Agarwal Associates,

3 23947

How Calculate Lap Length

L&T,

10 46004

why we do pcc.?

6 9234

door and window wood work calculations and different methods

APPSC,

1661

binding wire requirement in rcc structures

6 11436

give the full form for upvc pipe & cpvc pipe

ME, PVC, SWR,

4 74891

What is the basis of choice for cement sand plaster in ratio 1:4 and 1:6 on interior walls of a residential apartment.

Gammon,

3 18758

what is a well

1506

if rise and tread of stairs rae 16 & 25cm with landing slab of thickness 100mm . If there are 8steps, and carpenter ask for to mark the bottom of centering of landing on column, what will be the height above floor finished level?

2 5079

how many labour is required for 1cum of concrete?

6 35038

plz answer the questions, How do you check the quality of foundation? and What is the key performance area in quantity survey?

1 4188

how many kilograme per metre run of 6mm diameter steel bar

6 7988

how can change 12mmdia@150c/c bar spacing to 16mmdia

Amanah Tech, Envoy Group, Globus Constructions,

12 137967


Post New Civil Engineering Questions

Un-Answered Questions { Civil Engineering }

What is need for setting limits?

648


what is E VALUE FOR WOOD

1522


Questions related to civil.engg in company

1572


how to find hardness of water?why it should be determined?

1583


how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?

2127






how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.

3325


How to calculate cement and river sand material Qty for waterproofing base coat and finish coat

1880


How to decide/consider the grade of bitumen for dbm.

1765


what is the steel difference between np-2 and np-3 pipes and weight also

1679


What are your future hopes for this job?

1833


How do you maintain water pressure?

652


What are the reasons for geotechnical site investigations in uganda?

644


how to calculate the concrete mix m30 by volume

1092


Define What glue is least sticky?

642


what r the precaution for high in atp tempareture,low in atp tempareture

1584