Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Topic :: Short Circuit





Short Circuit Interview Questions
Questions Answers Views Company eMail

where is the need for short circuit test for 3 see is required and why? can you explain in brief with application

1903

Short circuit current of 2500 KVA 11/0.415 KV transformer both Secondary and primary side. best regards. Ali

1 3723

why do we use UPF watt meter in short circuit test of the transformer and LPF watt meter in open circuit test of the transformer

Bell, TCS,

2 33617

how to calculate short circuit calculation of the transformer by usuing the percentage impedence? formula needed.

L&T,

2 6563

short circuit test of transformer gives what?

NTPC,

9 14642

why open circuit test is conducted on hv side and short circuit test is conducted on lv side of a transformer ?what is the reason for it ?

HCL, NTPC,

3 48639

If short circuit ratio is high is it bad or good for a machine then tell the reason...

Bhel,

1983

Explain the iniluencc of short circuit ratio on the pert'orniancc of synchronous machine.

2143

what is the function of short circuit maintenance ct and droop ct.

L&T,

1 5631

234 MVA Generator 3 phase Short circuit current Values required? Gen set Rating-234 MVA, Gen Voltage-18kv, PF;0.8, Xdv:23.5 %, Transformer Rating-18/380KV, 680MVA,Yndd1 two winding, Step up TR, ZT:35.50 %,X/R 4.33 Gen CB Position, CB open ,Disconnected open, Generator Running Voltage 18 Kv, Bi mistakes generator side earth switch Closed during that time short circuit current level in 3 Phase required, and how to test on site 234MVA Generator Short circuit current,

Jomel,

1972

234 MVA Generator 3 phase Short circuit current Values required? Gen set Rating-234 MVA, Gen Voltage-18kv, PF;0.8, Xdv:23.5 %, Transformer Rating-18/380KV, 680MVA,Yndd1 two winding, Step up TR, ZT:35.50 %,X/R 4.33 Gen CB Position, CB open ,Disconnected open, Generator Running Voltage 18 Kv, Bi mistakes generator side earth switch Closed during that time short circuit current level in 3 Phase required, and how to test on site 234MVA Generator Short circuit current,

Jubail O&M,

2176

WHAT IS THE FUNCTION OF SHORT CIRCUIT MAINTENANCE CT

KSEB,

2400

how to calculate short circuit breaking capacity KA for 2500kva 33kv transformer.

2206

What is the intent of short circuit studies?

3 5322

Why short circuit calculation is not required in LT cable sizing and requiredin HT cable sizing only

Chemtex,

2 11899




Un-Answered Questions { Short Circuit }

How to do bus bar short circuit calculation for 230KV/11kv, 60 MVA Substation?

4681


WHAT IS SHORT CIRCUIT STRENGTH OF 100 AMPS MCCB?

2058


Thermal withstand capability under full short circuit conditions, in terms of number of times of occurrence of short circuit and corresponding anticipated percentage reduction in transformer life.

2388


Whether the vacuum contactor requires Short circuit protection?If No,why?

1982


CAN ANYBODY PLEASE TELL ME HOW TO DESIGN A SERIES REACTOR FOR LIMITING SHORT CIRCUIT FAULT CURRENT??

1836


how we can calcultae the short circuit level for bus bar

2171


what is the easiest method of short circuit current calculation ? pls. derive with a mathematical example in real life application.

2374


How we can determine short circuiting current any plant and for example a plant which power generation is 415 volts and plant load is 500 kw.

1937


Please clarify 1. Icw: rated short circuit working withstand capacity 2. Icu: Rated ultimate breaking capacity 3. Ics: Rated service short circut withstand capacity 4. other specification of ACB

2686


how to determine the cable size...pls explain me with the formula taking particular load....does the factors like impedance & short circuit rating influence the cable size, if so how....

1992


-What shall be short circuit current of LV switchgear for a 1000 kva, 11.415kv, 3 phase tranformer with 5% reactance.

2066


following are the questions asked in interviews: 1) Considering the short circuit fault, which switchgear is preferable, SFU OR MCCB? Which operates faster? whicg one is popular in Indian Market and why? 2)Define SCPD. What is type2 coodination? 3)Why the contactor rating is higher for the fuseless selection than for fuse selection? whether the ratinf of SFU or MCCB remains the same in both the cases? 4)If the HP rating is known then can you calculate the ratings of L.V Switchgear(SFU/MCCB, contactor, OLR) without using the selection chart?

2006


To prove the capacity of a 10MVA transforemr with 6.5% impedance by a short circuit test how much power is needed to inject an impedance voltage if we have to arrive for its rated current?

1855


why do you add the load short circuit impedance when considering short circuit amperage. It seems that you should only consider supply. If you need to consider loads and you don't know what loads are to be added , what would be a good sub-transient reactance rating for the loads?

1749


Why are short circuit ratings always 16kA,25kA,36kA and 50kA.Who has fixed these?

4221