At what phase tester role starts?
Answers were Sorted based on User's Feedback
Answer / sylvie
Testing starts as early as possible in the SDLC - static
testing (e.g. plan reviews, document reviews,
walkthroughs,code inspections) should be done throughout
the SDLC.
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / uday
It is depends the software model followed for that project.
In some models it starts early(V-model), and in some models
it is late(in waterfall model).
In Agile model, testing will be there from the first piece
of code.
Ideal phase is information gathering phase.
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / lakshmikantha b
In SDLC after completion of FRS document the test lead
prepare the use case document and test plan document, then
the tester role is start
| Is This Answer Correct ? | 1 Yes | 1 No |
What it means by test harness?
what is control sheet?
What is system test?
What is quality matrix in software testing?
What n+1 testing is?
Which activity in the fundamental test process includes evaluation of the testability of the requirements and system?
How you are breaking down the project among team members?
How many triangles are there in the following figure?
1 Answers EA Electronic Arts, Wipro,
What is the term for decomposing a software program so that latent design information can be extracted? 1. Reengineering 2. Regression 3. Restructuring 4. Reusability 5. Reverse engineering
Tell me about your Company Process mmeans how you are getting the projects from client, how the project categorized in module, how assignment was done, How you are getting you module? which life cycle and process.
Share 2 high complexity and 2 low complexity test cases for a coke vending (ATM) machine.
0 Answers HPCL, Hughes Systique Corporation,
What is Software reliability?