How many Reports Can be Got from Test Director?
Answer / yasobant badatya
User can create the reports from every component in QC. If
you are in Requirements tab, you can also generate the
coverage report.
If you are in Test Plan, you can also able to view the test
cases design coverage from there.
You can create the Test Execution/Defects Summary/Priority
wise executions/Day wise Executions/Resource wise
Executions/Progress Reports on hour basis/Manual and
Automation coverage and etc. reports from Test Lab using
Live Analysis. You can also export these reports into xls
or any other formats for updation to your senior
management. You can also create various graphs from these
reports.In this way you can create max up to 40 reports
(Private or Public Reports). Private reports can be
viewable in their own logins where as Public reports can be
accessed by everybody inside the team(who are authorized to
access that respective project).
I have used these methods in my projects. I think these
reports are enough for Reporting and tracking the progress.
Using the Dashboard also we can prepare the other reports
based on the accelerators purchaged by your organization.
| Is This Answer Correct ? | 8 Yes | 0 No |
What is the difference between Qualtiy center and Test Director?
16 Answers AMAT, Mastek, Texas Instruments,
what is test bed in terms of software?
which is the latest versions of winrunner ,qtp, test director companies now using in real time?
how do we find that there are duplicate bugs in Test Director or quality center?
how will you do execution workflow, creat and modify test sets
What is the purpose of (three)each view?
What r the mandatory fields in TD?
Of course, Test Director has recapped as Quality Center. What is the main difference between 8.2 version and 9.2 version of Quality Center?
how to import excel/word data into the test plan module of quality center 9.0
How can we add requirements to test cases in test director?
Trying to install Test Director 7.5 on my laptop which has windows vista home premium. The error message i am getting is IIS not installed. But IIS 7 is installed and working fine. I also installed IIS 6.0 Metabase Compatibility Layer in "Turn Windows Features on or off" in Vista. But still not successful. Can anyone tell me what is the problem? what version of IIS does test director 7.5 support?
What are the drawbacks of TD??