If i want to map a organization structure, where i hv 1
operating unit that is looking after only purchasing and
payables activities, whereas another operating unit is
looking after OM as well as receivables. I hv one more
warehouse or say plant, where i am manufacturing &
despatching the goods.
Wiil it be solved by setting up purchasing at one OU and OM
at another OU. Do I need to perform any additional setups?
Please Suggest.
Answers were Sorted based on User's Feedback
Answer / guest
I could not get the reason for having diff OU for
Purchasing and OM seperately. Anyway if this what is
required, then this can be created as seperate OUs e.g A
for PO,AP and B for OM,AR respectively. Also MFG &
dispatching warehouse can be setup as inventory
organization in B OU (OM,AR) and internal sales order setup
has to be done between OU A and OU B to transfer the raw
material required for manufacturing . Then dispatchign can
be done from B OU (mfg warehouse)
| Is This Answer Correct ? | 18 Yes | 1 No |
Answer / guest
As per answer given is it possible to make ISO between 2 OU's?
I think here we need to do the setups for Inter company.
Apart from this if we do Inter company transfer then we need to create Internal Requisition in OU B where is the Purchasing setups are not available. As well we will dispatch the material from OU A there we don't have the OM and AR. So it is not possible to dispatch the material from OU A.
| Is This Answer Correct ? | 2 Yes | 0 No |
What are step included to make a final assembly?
What are the modules generally covered under Oracle Manufacturing Apps
11 Answers Al-Qahtani, Axis Solutions, Wipro,
Types of Calendar? where we are define it?
How Many Inventory Org can be/are there
Do you mean by API
What are the Required Setups need to be done in Inventory?
What is an Organization Assignment?
What is difference between Sub inventory Transfer and Move order Transfer?
What are the basic modules of Oracle Apps? Which are very popular
24 Answers Accenture, iGate, TCS, Textiles, Wipro,
In osp cycyle i have one finished goods -FG1 Raw material - RM1 Osp Item - OSP1 Resource -Ospres01 Charge Type -PO Move I assign dept, then i created routing and bom. then i realsed job the PO requestion Generated But when i replace on another OSP ITEM - OSP2 for OSP1 having same attributes i am not getting Po requestion CAn any one help me? Thanks in advance, Raghunandana raghu.nandana@rediffmail.com
hOW CAN We define bY Product in Discrete mfg
what is differnce between Tomanufactring leadtime and total lead time and total cumulative lead time?