What are basic steps for AIM?
Answers were Sorted based on User's Feedback
Answer / xyz
there are six basic steps of AIM
i. Definition Phase
ii. operation analysis
iii.Solution design
iv Build phase
v. transition Phase
vi. Production Phase
Is This Answer Correct ? | 7 Yes | 1 No |
MD50 Content:-- MD70 CONTENT:--
COMPONENT DETAILS TECHNICAL OVERVIEW
BUSINESS NEEDS PARAMETERS
USER PROCEDURE REPORT LAYOUT
BUSINESS RULES REPORT OUTPUT
LAYOUT STRUCTURE VALIDATION LOGICS
REPORT PARAMETERS OPEN&CLOSE ISSUES
CONCURRENT PROGRAM DETAILS
TECHNICAL OVERVIEW
Is This Answer Correct ? | 0 Yes | 0 No |
What is responsibility and how u attach
in one report using two layout models.if yes how to do
How to generate XML Report with out using rdf?
6 Answers BirlaSoft, Patni, UST,
what is Flex mode and Confine mode?
Sys Admin Module?
In thet custom.pll what are the events we can write.
in ap_terms table what data will be stored
What is the Use of User Exit in Oracle apps and when we are developeing the new report you need to pass one parameter called P_CONC_REQUEST_ID,what is the use of this parameter and is it mandatory.Can't we develop report without this User exit's and P_CONC_REQUEST_ID parameter
In Per_all_people_f table what is the significance of '_f ' ?
Tell me some errors names and number what u got while developing the reports?
how can develope the po variance and po summary report? with tables mandatory columns and query please?
can we use anchor propery in XML reports?if yes?explain?