How to plan the time estimations for QA cycle ?
Answers were Sorted based on User's Feedback
Answer / raj
Study requirements
Prepare test plan and identify the functionalities to be
tested in cycle
Identify the test approach
Identify test points and complexity of each test point.
Calculate the time required by one resource to complete one
function and based on this complete the estimation. Plan
the cycles based on the type of testing for
example :functional/system testing and then regression and
UAT.
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / editor
For estimation
there are different kinds of estimation techniques.
1. Expert based- needs to derive FP's
2.Experienced based' Based on Previous project exp
3. WBS - break down structure..
| Is This Answer Correct ? | 2 Yes | 1 No |
Q. How do you select product components for validation?What are the contents of QMS?
how can i wrtie testcases for huge data
I. Policymaker II. Technical specialist III. Project manager IV. Software development manager The personnel listed above represent a partial list of candidates for the configuration control board (CCB). In addition to software QA and software CM, which of these personnel should be included on the CCB? 1. II and IV 2. II 3. II and III 4. I and II 5. I, II, III, and IV
As a tester I'm looking for web 2.0 Style Software Testing Management tool- any suggestions?
Explain what is traceability matrix?
Explain the types of documents in software quality assurance?
How to write the test cases for history of chat ?
What is destructive testing, and what are its benefits?
what is compliance testing
Mention the different types of software testing?
why we do testing ? what r the uses?
10 Answers IBM, Thatavarti Technologies,
Case Study:-Given a standard calculator with the basic functionality of addition,substration,multiplication and division-write the test case to test this and tell how did it take to write the above test case and how ling would it take to execute them?