Answer / raj
Study requirements
Prepare test plan and identify the functionalities to be
tested in cycle
Identify the test approach
Identify test points and complexity of each test point.
Calculate the time required by one resource to complete one
function and based on this complete the estimation. Plan
the cycles based on the type of testing for
example :functional/system testing and then regression and
UAT.
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / editor
For estimation
there are different kinds of estimation techniques.
1. Expert based- needs to derive FP's
2.Experienced based' Based on Previous project exp
3. WBS - break down structure..
| Is This Answer Correct ? | 2 Yes | 1 No |
What is a test strategy and what does it include?
What are the types of documents in sqa?
What is conformance testing?
What is test execution/efficiency metrics?
What would be a good answer when someone asks 'What was your best bug you found'? How does a person know whats the best bug? I never found the best bug..all my bugs are good.
What do you mean by High Level and Low Level Scenarios explain using an Example ?
What is Test Scripts What is static testing and dyanmic testing. Explain with an example
Performance Evaluation means..?
0 Answers HCL, Kernex Micro Systems,
How to write test case from the MS word on Creating a new document called Good world ?
What is the difference between testing and Quality Assurance?
How to Map Test Cases with requirement while import test cases to QC from excel.
What are the various tools you have used in testing process?