What mean by STLC (S/W testing life cycile)?
Answers were Sorted based on User's Feedback
Answer / nitin verma
Hi,
STLC is software test life cycle it starts with :-
1. Preparing the test strategy
2. Preparing the test plan
3. Creating the test environment
4. Writing the test cases
5. Creating test scripts
6. Executing
7. Analyzing the results the test scripts and reporting the bugs
8. Doing regression testing
9. Test exiting
Plz correct me if i m wrong...
Regards.
nitin9360@gmail.com
| Is This Answer Correct ? | 19 Yes | 4 No |
Answer / shweta
STLC consists of the following :
Prepare for test Plan
Test Design
Test Execution
Bug reporting
Inspection and release
Client Acceptance
Support during acceptance testing
Test summary report
| Is This Answer Correct ? | 16 Yes | 8 No |
Answer / lintymol k.j
STLC is Software Testing Life Cycle.It contains 7 Phases
1.Test planning
2.Test Analysis
3.Test Design
4.Costruction and Verification
5.Testing Cycles
6.Final Testing and Implementation
7.Post Implementation
| Is This Answer Correct ? | 4 Yes | 1 No |
Answer / pavan
Software testing life cycle contains 6 phases
1. Test plan
2. Test development
3. Test execution
4. Result analysis
5. Bug tracking and
6. Reporting
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / madhu
Identifies what test activities to carried out and when to
accomplish those test acyivities is called "test life cycle".
testing life cycle:
1)requirement phase
2)test analysis phase
3)test design
4)verification
5)test executon phase
6)result analysis phase
7)bug tracking
8)bug tracking and reporting
9)final implementaton
10)post implementation
| Is This Answer Correct ? | 2 Yes | 2 No |
Answer / harish
STLC phases are
1.review design/requirements
2.test plan
3.test design
4.test execution
5.defect tracking and reporting
6.test result analysis
7.test closer.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / prasanna
test plan,
test case,
test execution,
defect tracking,
reports
| Is This Answer Correct ? | 6 Yes | 7 No |
Answer / qa
STLC will have following phase:
1. Test plan
2. Test case
3. Executioin of test case
4. Bug reporting
5. Test Summary
| Is This Answer Correct ? | 2 Yes | 3 No |
Answer / abhishek kalla
Test requirement
Test Planning
Test Environment Setup
Test Design
Test Automation
Test Execution & Bug Tracking
Test Sign Off & maintenance
| Is This Answer Correct ? | 1 Yes | 2 No |
Answer / diya
Test plan preparation
Test case design
Test execution and test log preparation
Defect tracking
Test report
| Is This Answer Correct ? | 0 Yes | 1 No |
what is Risk-based testing?
Wht is Testing Frame work.Is it same in the Manual and Automation testing. can body can explain it in detail.. Thanks in advance G Laxmi narayana...
How can you do the usability testing?
How to do integration testing on duster......
In interview How do explain in Testcase of Calcuator,Cellphones, Email testing?
is live tech training institute best for learning testing tools in ameerpet
I want to know the real time cycle i.e SDLC.(First of all Buisness logic is prepared,but doesn't know by whom and with the help of whom?)Similarly what are the next steps (the persons involved) and connection in between the steps.
Give me some examples of how you have participated in Integration Testing.
What is the difference between Alpha and Beta Testing?
13 Answers Motorola, Reliance,
Tell exact difference b/w Smoke and Sanity testing with example?
what is stages in test plan?
What are all the important Key Metrics in Software Testing?