Plz anyone help me to write testcases for
squar,Triangle,Rectangle and Circle.
Answers were Sorted based on User's Feedback
Answer / megha jain
Circle: Diameter should pass through centre of circle.
Circle makes 360 degree angle.
diameter should be double of radius
radius should be half of diameter
area of circle should be 22/7x rxr
Circle have only one centre
| Is This Answer Correct ? | 9 Yes | 0 No |
Answer / hi
Square: It should contains 4 sides
4 sides should have equal length
Triangle: Triangle should be indicated with 3 sides and
maintain angles
Total of 3 angles should be equal to 180 degrees
For finding the are of triangle= A=1/2.b.h (should be
displayed correct area for this formula)
Rectangle: For rectangle it should have 6 phases
For calculating the area of rectangle formula is L*H
Circle:Should be represented in “Round shape” only…
try in this manner only
| Is This Answer Correct ? | 6 Yes | 6 No |
Answer / ravi
Square: should contain 4 equal sides.
angle between 2 sides must be equal to 90 deg.
Triangle: should contain 3 sides.
sum of the angles of triangle should be = 180 deg
Rectangle: should contain 4 sides.
angle between any 2 sides must be 90 deg.
Circle: when u draw a circle, the starting point should be
the ending point.
any point on the circle must be equidistant from
the centre
| Is This Answer Correct ? | 3 Yes | 4 No |
What is meant by Multi Unit Testing?
When is the best time for system testing
What is defect clustering
how many buils u r getting in u'r project?
5 Answers Professional Access,
last testcase for project will be written in which phase?
user A done some changes for a portion of test case doc. And user B also done some changes to same portion. If user-A checks in his file first then user-B. Then what is the state of that file?
how u can do integration testing and what r the approaches u need to follow?
What are the Important test scenarios which can be used for testing a web site?
scenario is like the following, a software to be installed in the train the work of the software is when ever any object comes opposite to it the train has to be stopped would u plese any bone tell us the test case for this
why feature not to be tested in test plan
while reading srs document if you will get any doubt, what you will do?
What is the difference between Monkey testing an Ad-hoc testing (If ur answer is same, then why we need two names)
6 Answers CFC, CTS, PRO, Protech,