After project was released to customer the customer find a
defect in u r build. the build is related to that area which u
had tested that. so u r TL comes and asks u then how will u
convince u r TL and The customer
Answers were Sorted based on User's Feedback
Answer / sudheendra patil
First check whether the test environment used by client and
you are same.Then check whether you have test case covering
this scenario.
-If your company is following proper processes, no one can
come to you.Because, BA would have reviewed the test
scenarios, HLTCs.Your peer would have reviewed the test
cases written by you.
-IF there is a test case covering the defect raised by the
customer, then the execution would have not happened
properly.If you have made some mistake while executing the
test case,just explain your TL how you have executed the
test case and own the responsibility.
Is This Answer Correct ? | 10 Yes | 0 No |
Answer / chaitu.c
first i try to explain what i had tested application, with
help of tracebility matrix. after that he cannot convince i
will try to let him know like some defects are not found in
during testing, that type of defects founded by the clients
at longtime usage of application. its cannot findout at
shorttime(testing.so that defect updated in future versions
if it is wrong correct me
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / k.chandra sekhar
a) 1st I will check the defect I executed or not
b) 2nd I will check the given trace ability matrix
that test data is given or not
c) If that defect in my build or next build I verify
d) That defect in new Addison after coming or not I
will check
e) If that defect I am found that time the developers
solved remarry or not I will check
f) This like some conditions I will checked
g) After the above the conditions I will try to
convince to my team lead and customers
My name is k.chandra sekhar
My phone no is 09246540049
I am in hyderabad
My mail id is ndra_143@yahoo.co.in
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / sameer
Its a very simple thing
- Communication is the key,report to the TL that it has
indeed been defect, but since not a showstopper, it can be
later on taken into Regression
- Customer should be told that regression testing would
happen and we will make sure to get rid of the defect
- Own the responsibility that the issue would be given a
priority
- Go through the documents properly and also the test cases
thoroghly
Is This Answer Correct ? | 1 Yes | 1 No |
What is the input for System testing?
what is the difference between test plan and test strategy?
how do you identify testscenario's
when tester found bug then where it is assign to developer or testlead
Difference between the stress and load testing?
what is the process followed in JAVA Testing compared to Normal Testing process.
What is alpha testing and beta testing?
How do you debug SSH?
difference between manual testing and blackbox testing
CAN ANY ONE PREPARE TEST CASES FOR SUPPLY ACHAIN MANAGEMENT AND IF YES I WILL GIVE THE REQUIREMENT WHICH CONTAINS NEARLY 27 PAGAES
what does a test plan contains and is a tester allowed to see the entire test plan or only the scheduling part of the test plan
What are the Major Functionality for a ATM machine ??