Answer / sudheendra patil
First check whether the test environment used by client and
you are same.Then check whether you have test case covering
this scenario.
-If your company is following proper processes, no one can
come to you.Because, BA would have reviewed the test
scenarios, HLTCs.Your peer would have reviewed the test
cases written by you.
-IF there is a test case covering the defect raised by the
customer, then the execution would have not happened
properly.If you have made some mistake while executing the
test case,just explain your TL how you have executed the
test case and own the responsibility.
| Is This Answer Correct ? | 10 Yes | 0 No |
Answer / chaitu.c
first i try to explain what i had tested application, with
help of tracebility matrix. after that he cannot convince i
will try to let him know like some defects are not found in
during testing, that type of defects founded by the clients
at longtime usage of application. its cannot findout at
shorttime(testing.so that defect updated in future versions
if it is wrong correct me
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / k.chandra sekhar
a) 1st I will check the defect I executed or not
b) 2nd I will check the given trace ability matrix
that test data is given or not
c) If that defect in my build or next build I verify
d) That defect in new Addison after coming or not I
will check
e) If that defect I am found that time the developers
solved remarry or not I will check
f) This like some conditions I will checked
g) After the above the conditions I will try to
convince to my team lead and customers
My name is k.chandra sekhar
My phone no is 09246540049
I am in hyderabad
My mail id is ndra_143@yahoo.co.in
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / sameer
Its a very simple thing
- Communication is the key,report to the TL that it has
indeed been defect, but since not a showstopper, it can be
later on taken into Regression
- Customer should be told that regression testing would
happen and we will make sure to get rid of the defect
- Own the responsibility that the issue would be given a
priority
- Go through the documents properly and also the test cases
thoroghly
| Is This Answer Correct ? | 1 Yes | 1 No |
if you have a test cases please send me on singhajay7786@gmail.com thanks in advance.
What's HTML content-checking tests
what is black phase in SDLC
What is common interface?
what is release notes?and when it is prepared and who prepares that?.
What is the difference between GUI testing and black box testing
What is the input for System testing?
what exactly done parallely in v-model with verification.
How will you assign priorities to test cases?
can anybody able to provide me answer with real time example....1) 5 critical,major & low severity and 5 critical,major & low priorities
How do you decide when you have 'tested enough?'
question about bug is valid or invalid ? suppose i don't have srs i want suggest close button in one form but the developer says client no need that one in this situation the bug is valid or invalid?