What is think time?



What is think time?..

Answer / Utkarsh Kumar Mishra

Think time in Load Runner refers to the period between user actions during scripting. It simulates human behavior by introducing pauses or delays between steps to mimic real-world usage patterns.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Load Runner Interview Questions

How can we test the performance of a stand alone music player. It also interacts with web, for few of the functionalities. Can we use Load Runner or Silk Performer for the same? Kindly guide me on this.

1 Answers   AOL,


What is the difference between Group and Scenario in Load Runner Controller terminology?

4 Answers   ADP,


What r the arguments in lr_set_debug function

3 Answers   Symphony,


Difference b/w 9.1 and 9.5 Versions in LoadRunner?

3 Answers  


what is mean BVT and BAT? difference between BVT and BAT

1 Answers  


Analysis Scenario (Bottlenecks):?

2 Answers  


What is difference between manual scenario and goal oriented scenario?

1 Answers  


what is loadrunner?

1 Answers   Wipro,


parameterization methods and correlation concepts

1 Answers  


how to add 100 for dynamic(correlate value) value

1 Answers   iGate,


How to increase the load on Server when number of users restricted?

3 Answers  


Explain the Load testing process?

2 Answers  


Categories