A, B and C contract a work for Rs. 550. Together A and B are
supposed to do 7/11th of the work. How much does C get?
(a) Rs. 270
(b) Rs. 200
(c) Rs. 310
(d) Rs. 175
(e) None of these
Answers were Sorted based on User's Feedback
Answer / suchi teegala
let the total work to be done =1
so a+b+c=1 (say)
then a and b are supposed to do 7/11 th of work
so c= 1- (7/11)
c=4/11
therefore c gets (4/11)*550
=200 is the answer
| Is This Answer Correct ? | 35 Yes | 0 No |
Answer / ram
since 11 times the total is 550 then one time it is 50.
then 7 times is 50*7 = 350
in this total 550 7 times is 350 then the rest is 4 time
which is = to 4*50 = 200
or 550-350=200
| Is This Answer Correct ? | 4 Yes | 1 No |
Here A,B together to do is=7/11 of total work
so their money is=550*7/11=350
Remaining is C's amount=550-350=200
C get 200 out of total 550
| Is This Answer Correct ? | 4 Yes | 1 No |
Lowest sum of three odd number
A car is filled with four and half gallons of oil for full round trip. fuel is taken 1/4 gallons mor3 in going than coming. what is the fiel consumed in coming up?
What s de answer for this question : Three independent mechanisms A, B and C have been incorporated for power saving in a plant producing respectively 30%, 40% and 10% efficiency. Assuming that they operate independently, what is the net power efficiency achieved. (a) 62.2% (b) 68% (c) 61% (d) 64% (e) 56%
rrb second stage written exam in aptitude test model papers
Four of the following are alike in a certain way and hence form a group.Which of the following does not belong to that group? A) 9 B) 216 C) 8 D) 64 E) 512
3 Answers ITC Indian Tobacco Company, SSC,
On Monday a manufacturer processed a batch of bats, on Tuesday he processed three times as many, and on Wednesday he processed 4000 bats. In the three days, He processed 16000 bats. How many did he process on Tuesday?
Dear sir plz send me last 5 years solved question paper of sbi clerk post & probationary officer post on my rediff id .my rediff id is vpkrishna_s@rediffmail.com
Let C be a circle with centre P0 and AB be a diameter of C. Suppose P1 is the mid point of the line segment P0B, P2 is the mid point of the line segment P1B and so on. Let C1, C2, C3, ...... be circles with diameters P0P1, P1P2, P2P3 ... respectively. Suppose the circles C1 C2, C3, .... are all shaded. The ratio of the area of the unshaded portion of C to that of the original circle C is
A=1 B=2 C=3 D=4 E=5 . F=10 G=20 H=30 I=40 J=50 . K=100 L=200 M=300 N=400 O=500 P=1000 Q=2000 R=3000 S=4000 T=5000 U= 10000 V=20000 W=30000 X=40000 Y=50000 Z=100000
Plz help me to get Aptitute test questions for SBI Clerical exams.
0 Answers State Bank Of India SBI,
which company is invented the tally software.
Hi i am going to prepare for RRB exam so can you please send me some Questions paper my id is salvepramods@gmail.com