What is the loadrunner end transaction and its syntax?
No Answer is Posted For this Question
Be the First to Post Answer
I need to perform a 4hr test run in performance center 9.0 there i need to rampup 10 users after 1 hour. I selected the run tab and added users to down state -> Ready state-> initialise-> Run state. 10 users ramped up successfully for the next 1 iteration only after that the 10 users automatically goes to the stop status. But i want the ramped up users to be carried out for the next 3 hours. Please help me out how to do the rampup successfully for the remaining time period.
What is the scripting language using in LoadRunner?
13 Answers IBM, Patni, Symphony,
We add think time between two transaction to give interval between transactions. Why?
While running a scenario in loadrunner controller,the component suddenly hangs and gets closed automatically,the results of the test is no saved and when i open the scenario now,how can i get the results back.?
During run time where the hosts saves the files?
What is user defined functions in Load Runner ? Give some Examples ?
What is the difference between Scalbility Testing and Volumetric Testing. in Performance Testing?
Which is the best institute for LOAD RUNNER in HYD? what is the market for LR present?
How is the Best Faculty for LoadRunner in Hyderabad
What is bench mark specifications in requirements?
How did you plan the Load? What are the Criteria?
Can you list the types of error messages you can find in loadrunner(either in VUgen or Controller). with an explanation and their solutions would help. Thankyou all