Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


What are the End to End scenario's you are following in
your company in loadtesting or Performance testing ?

Answers were Sorted based on User's Feedback



What are the End to End scenario's you are following in your company in loadtesting or Perfor..

Answer / suhel sheikh

The normal scenario starts by selecting the scripts that
you want to run, you can run multiple scripts
simultaneously. Then select the total number of user for
which you want to run the scenario. The users are divided
equally between the scripts by default. e.g. If there are
four scripts and 100 users. The default load will be 25%
each, so 25 users for each script. You can change the load
as you want, like you can run 30% users for 2 scripts, 25%
for third and 15% for the rest. Then you need to select the
Load Generators on which you are generating the loads.
Select from the list and connect to all to make them ready.
Once you have created scenario you need to set up schedule.
Load Runner provides options to run all the Vusers
simultaneously or define a ramp up - ramp down time. Ramp
Up means you are gradually increasing the load. You specify
how many users at a specified time interval. Than in
Duration specify for how much time you want to run the
script with all the users up. The duration does NOT include
the Ramp up and Ramp down time. After defining scenario,
you are done. Just click "Run" to start execution.

Is This Answer Correct ?    3 Yes 3 No

What are the End to End scenario's you are following in your company in loadtesting or Perfor..

Answer / basava

End To End Flow is:
Non-Functional Requirement Collection: which includes the environment, server and database and some other requirements which helps to analyse the existing/new application.
Test script creation.
Work Load Design: which tells about the user distribution.
Test Execution.
Analysis of results.
Reporting/Documentation.
Conclusion of the test(any bottlenecks, performance tuning and etc).

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Load Runner Interview Questions

What is use of URL Mode Recording?

3 Answers   Honeywell,


Where do you set automatic correlation options?

1 Answers  


Explain performance testing life cycle.

0 Answers  


U r taken ORD=All in correlated function.What it represents.Now i want to capture the ORD=3 occurance& place it in web_submit_data of vu gen script. How can u do it?

5 Answers   EDS,


Which are online monitors and windows resource monitors

0 Answers   Cap Gemini,


what is built monitors and they are explain plz?

2 Answers   iGate,


how to configure yahoo cookies in load runner

4 Answers   ZapApp India,


Hi Guys, Is it possible to merge and compare graphs from different scenarios in load runnner ?

7 Answers  


Suppose you are not using Web server (But using Application Server and DB server). Then what are the graphs available in LoadRunner?

0 Answers  


Plz someone tell me about user interface testing and backend testing and hw did u use it in ur project.plz give a detail answer i need to explain it to the interviewer. plzzzzzzzzz guys its urgent.

3 Answers  


What is a function to capture dynamic values in the web Vuser script?

4 Answers  


What are the drawbacks of LoadRunner tool?

4 Answers  


Categories