Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


What are the End to End scenario's you are following in
your company in loadtesting or Performance testing ?

Answers were Sorted based on User's Feedback



What are the End to End scenario's you are following in your company in loadtesting or Perfor..

Answer / suhel sheikh

The normal scenario starts by selecting the scripts that
you want to run, you can run multiple scripts
simultaneously. Then select the total number of user for
which you want to run the scenario. The users are divided
equally between the scripts by default. e.g. If there are
four scripts and 100 users. The default load will be 25%
each, so 25 users for each script. You can change the load
as you want, like you can run 30% users for 2 scripts, 25%
for third and 15% for the rest. Then you need to select the
Load Generators on which you are generating the loads.
Select from the list and connect to all to make them ready.
Once you have created scenario you need to set up schedule.
Load Runner provides options to run all the Vusers
simultaneously or define a ramp up - ramp down time. Ramp
Up means you are gradually increasing the load. You specify
how many users at a specified time interval. Than in
Duration specify for how much time you want to run the
script with all the users up. The duration does NOT include
the Ramp up and Ramp down time. After defining scenario,
you are done. Just click "Run" to start execution.

Is This Answer Correct ?    3 Yes 3 No

What are the End to End scenario's you are following in your company in loadtesting or Perfor..

Answer / basava

End To End Flow is:
Non-Functional Requirement Collection: which includes the environment, server and database and some other requirements which helps to analyse the existing/new application.
Test script creation.
Work Load Design: which tells about the user distribution.
Test Execution.
Analysis of results.
Reporting/Documentation.
Conclusion of the test(any bottlenecks, performance tuning and etc).

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Load Runner Interview Questions

How do u do monitoring ?

1 Answers   Accenture,


What is the performance testing approach ?

4 Answers   Accenture,


Types of frameworks which is fallowd in Loadrunner ? real timers plz(Chandana)

7 Answers   TCS,


can u name some of the important functions in LoadRubber Scripting?

1 Answers   CTS,


What is correlation? Explain the difference between automatic correlation and manual correlation?

5 Answers  


what is the alternative of web_reg_find function?

4 Answers   TATA,


what is the diff b/w loadrunner 8.1& loadrunner 9.5

2 Answers  


What is the difference between Group and Scenario in Load Runner Controller terminology?

4 Answers   ADP,


what is mutation testing?

15 Answers   Curam Software, Yahoo,


What Is The Cofidence Level In Load Runner?

1 Answers   Covansys,


How to get the intermediate results from Controller, for example, when a 10 hours execution is going on in Controller, before the execution is completed how we can get the results at some 5 hours. Is it possible? (Not through graphs)

0 Answers  


What is the Diffrence between Clint server & Web based application ? plz Explain in detail (Chandana)

1 Answers   IBM,


Categories