entry criteria and exit criteria for unit testing, integration
testing, system testing and uat
Answer / neethu sebastian
Entry criteria for unit test
1.) All the requirement and documents are reviewed, finalized and approved.
2.) Application development should be completed
3.) Test environment is ready
4.) UnitTest Framework must be ready (in case of automated unit testing)
5.) Unit testing tools like Rational Software, JavaScript Assertion Unit, CUT, Dotunit ...etc (if tools are using) must be installed and configured.
(** last 2 points are optional hence can be avoided in interviews)
Exit criteria for Unit testing
1.) All the Unit test cases are executed.
2.) All the defects are resolved.
3.) coding is completed
4.) Code optimization (removal of redundant code, labeling of codes, removal of unused labels, removal of warning ..etc) is completed.
Entry criteria for integration testing
1.) Unit test exit criteria must meet
2.) Test environment should be ready
3.) Integration plan should be ready.
4.) Each module must gone through unit testing before the integration process.
Exit Criteria for Integration testing
1.) Successful execution of the integration tests.
2.) All priority bugs are resolve and closed.
Entry criteria for System testing
1.) Successful completion of integration testing process.
2.) Priority bugs found during integration testing must be fixed and closed.
3.) System testing environment must be available.
4.) Test cases must be available to execute
Exit Criteria for system testing
1.) Successful execution of the system tests.
2.) All specified business and functional requirements must be met.
3.) Priority bugs have been fixed and closed.
4.) Systems compatibility must be tested on various platforms
Entry Criteria for acceptance testing
1.) Successful completion of system testing phase.
2.) Priority bugs found during previous testing activities must be fixed and closed.
3.) Functional and Business requirement must be met.
4.) Acceptance testing environment should be ready.
5.) Test cases must be available.
Exit Criteria of Acceptance testing
1.) Successful execution of the user acceptance tests.
2.) approval for test Closure
3.)All Business requirements must be fulfilled.
4.) No critical defects are left out.
| Is This Answer Correct ? | 0 Yes | 0 No |
what is test coverage?
What is a show stopper?
do u know abt configuration management tool,what is the purpose of maintaining all the documents in configuration manage ment tool?
1 Answers Cap Gemini, Sapient,
What is the initial stage of testing?
What is differnce between bug and error?
How we can explain a bug which may arrive at the time of testing? Explain that bug in details?
how to write testcase for toaster?
Hi I am B.tech graduate.Right now i am working sutherland as a technical support exce.I have completed CSTP certification in STC .I got a opportunity from STC third eye.. They asked me to pay 50,000 and they will give training and also they will give job with 5000 salary.. I dont know which option is best for me, since i am fresher for this software industry.. I have a dilemma,since its little bit risky option... shall I choose this optionplz give me some suggestion...
How performance testing can be done manually? can anyone answer this question plz?
Contents in Tracebility matrix?
14 Answers JVS, NIIT, TCS,
Test Director is use only for bug tracking or another purpose.
Enlist types of testing performed for any window in sequence?