During which phase of a system development process should an
IS auditor first raise the issue of application controls?

A. Construction

B. System design

C. Acceptance testing

D. Functional specification



During which phase of a system development process should an IS auditor first raise the issue of ap..

Answer / guest

Answer: D

It is important that IS auditors raise control concerns as
early as possible. Frequently, the requirement for controls
is not clearly specific when developing the functional
specifications. The IS auditor should ensure that the
business areas specify their requirement for control at that
stage. The construction phase of the project is often too
late for the identification of the controls, since this may
require that changes be made in the design. Controls should
be designed in at the system design stage, but the types of
controls should have been identified as part of the
functional specification. The acceptance testing stage is
too late to identify controls, since this can require major
changes to the system.

Is This Answer Correct ?    5 Yes 0 No

Post New Answer

More CISA Certification Interview Questions

Which of the following would an IS auditor consider the MOST relevant to short-term planning for the IS department? A. Allocating resources B. Keeping current with technology advances C. Conducting control self-assessment D. Evaluating hardware needs

1 Answers  


Which of the following is the MOST critical element of an effective disaster recovery plan (DRP)? A. Offsite storage of backup data B. Up-to-date list of key disaster recovery contacts C. Availability of a replacement data center D. Clearly defined recovery time objective (RTO)

1 Answers  


When reviewing a system development project an IS auditor would be PRIMARILY concerned with whether: A. business objectives are achieved. B. security and control procedures are adequate. C. the system utilizes the strategic technical infrastructure. D. development will comply with the approved quality management processes

1 Answers  


An IS auditor performing an application maintenance audit would review the log of program changes for the: A. authorization for program changes. B. creation date of a current object module. C. number of program changes actually made. D. creation date of a current source program.

1 Answers  


Which of the following should be included in an organization's IS security policy? A. A list of key IT resources to be secured B. The basis for access authorization C. Identity of sensitive security features D. Relevant software security features

1 Answers  






In addition to the backup considerations for all systems, which of the following is an important consideration in providing backup for online systems? A. Maintaining system software parameters B. Ensuring periodic dumps of transaction logs C. Ensuring grandfather-father-son file backups D. Maintaining important data at an off-site location

1 Answers  


To reduce the possibility of losing data during processing, the FIRST point at which control totals should be implemented is: A. during data preparation. B. in transit to the computer. C. between related computer runs. D. during the return of the data to the user department.

2 Answers  


Which of the following is a control over database administration activities? A. A database checkpoint to restart processing after a system failure B. Database compression to reduce unused space C. Supervisory review of access logs D. Backup and recovery procedures to ensure database availability

1 Answers  


A proposed transaction processing application will have many data capture sources and outputs in both paper and electronic form. To ensure that transactions are not lost during processing, the IS auditor should recommend the inclusion of: A. validation controls. B. internal credibility checks. C. clerical control procedures. D. automated systems balancing.

1 Answers  


While reviewing an ongoing project, the IS auditor notes that the development team has spent eight hours of activity on the first day against a budget of 24 hours (over three days). The projected time to complete the remainder of the activity is 20 hours. The IS auditor should report that the project: A. is behind schedule. B. is ahead of schedule. C. is on schedule. D. cannot be evaluated until the activity is completed.

1 Answers  


Which of the following would enable an enterprise to provide access to its intranet (i.e., extranet) across the Internet to its business partners? A. Virtual private network B. Client-server C. Dial-in access D. Network service provider

1 Answers  


A goal of processing controls is to ensure that: A. the data are delivered without compromised confidentiality. B. all transactions are authorized. C. accumulated data are accurate and complete through authorized routines. D. only authorized individuals perform sensitive functions.

1 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)