During which phase of a system development process should an
IS auditor first raise the issue of application controls?

A. Construction

B. System design

C. Acceptance testing

D. Functional specification



During which phase of a system development process should an IS auditor first raise the issue of ap..

Answer / guest

Answer: D

It is important that IS auditors raise control concerns as
early as possible. Frequently, the requirement for controls
is not clearly specific when developing the functional
specifications. The IS auditor should ensure that the
business areas specify their requirement for control at that
stage. The construction phase of the project is often too
late for the identification of the controls, since this may
require that changes be made in the design. Controls should
be designed in at the system design stage, but the types of
controls should have been identified as part of the
functional specification. The acceptance testing stage is
too late to identify controls, since this can require major
changes to the system.

Is This Answer Correct ?    5 Yes 0 No

Post New Answer

More CISA Certification Interview Questions

When a new system is to be implemented within a short time frame, it is MOST important to: A. finish writing user manuals. B. perform user acceptance testing. C. add last-minute enhancements to functionalities. D. ensure that code has been documented and reviewed.

1 Answers  


In which of the following phases of the system development life cycle (SDLC) is it the MOST important for the IS auditor to participate? A. Design B. Testing C. Programming D. Implementation

1 Answers  


During an audit of the tape management system at a data center, an IS auditor discovered that parameters are set to bypass or ignore the labels written on tape header records. The IS auditor also determined that effective staging and job setup procedures were in place. In this situation, the IS auditor should conclude that the: A. tape headers should be manually logged and checked by the operators. B. staging and job setup procedures are not appropriate compensating controls. C. staging and job setup procedures compensate for the tape label control weakness. D. tape management system parameters must be set to check all labels.

1 Answers  


During a review of a customer master file an IS auditor discovered numerous customer name duplications arising from variations in customer first names. To determine the extent of the duplication the IS auditor would use: A. test data to validate data input. B. test data to determine system sort capabilities. C. generalized audit software to search for address field duplications. D. generalized audit software to search for account field duplications.

1 Answers  


Which of the following techniques would provide the BEST assurance that the estimate of program development effort is reliable? A. Function point analysis B. Estimates by business area C. A computer-based project schedule D. An estimate by experienced programmer

1 Answers  


The most likely error to occur when implementing a firewall is: A. incorrectly configuring the access lists. B. compromising the passwords due to social engineering. C. connecting a modem to the computers in the network. D. inadequately protecting the network and server from virus attacks.

1 Answers  


Which of the ISO/OSI model layers provides for routing packets between nodes? A. Data link B. Network C. Transport D. Session

1 Answers   Network,


An IS auditor reviewing an organization's IT strategic plan should FIRST review: A. the existing IT environment. B. the business plan. C. the present IT budget. D. current technology trends.

1 Answers  


The application test plans are developed in which of the following systems development life cycle (SDLC) phases? A. Design B. Testing C. Requirement D. Development

1 Answers  


Which of the following processes describes risk assessment? Risk assessment is: A. subjective. B. objective. C. mathematical. D. statistical.

1 Answers  


To check the performance of flow and error control, an IS auditor should focus the use of a protocol analyzer on which of the following layers? A. Network B. Transport C. Data link D. Application

2 Answers  


With reference to the risk management process, which of the following statements is correct? A. Vulnerabilities can be exploited by a threat. B. Vulnerabilities are events with the potential to cause harm to IS resources. C. Vulnerability exists because of threats associated with use of information resources. D. Lack of user knowledge is an example of a threat.

1 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)