Which of the following is an objective of a control
self-assessment (CSA) program?
A. Audit responsibility enhancement
B. Problem identification
C. Solution brainstorming
D. Substitution for an audit
Answer / guest
Answer: A
An objective associated with a CSA program is the
enhancement of audit responsibilities (not a replacement).
Choices B and C are advantages that accrue from a CSA
program, but are not objectives. A CSA program is helpful in
determining audit steps by gaining an overall understanding
of the audit subject and audit objective. Performance of a
CSA will not replace formal audits (choice D).
| Is This Answer Correct ? | 7 Yes | 0 No |
The BEST time to perform a control self-assessment involving line management, line staff and the audit department is at the time of: A. compliance testing. B. the preliminary survey. C. substantive testing. D. the preparation of the audit report.
In a small organization, an employee performs computer operations and, when the situation demands, program modifications. Which of the following should the IS auditor recommend? A. Automated logging of changes to development libraries B. Additional staff to provide separation of duties C. Procedures that verify that only approved program changes are implemented D. Access controls to prevent the operator from making program modifications
An organization has contracted with a vendor for a turnkey solution for their electronic toll collection system (ETCS). The vendor has provided its proprietary application software as part of the solution. The contract should require that: A. a backup server be available to run ETCS operations with up-to-date data. B. a backup server be loaded with all the relevant software and data. C. the systems staff of the organization be trained to handle any event. D. source code of the ETCS application be placed in escrow.
Which of the following is a control to compensate for a programmer having access to accounts payable production data? A. Processing controls such as range checks and logic edits B. Reviewing accounts payable output reports by data entry C. Reviewing system-produced reports for checks (cheques) over a stated amount D. Having the accounts payable supervisor match all checks (cheques) to approved invoices
Which of the following would an IS auditor consider to be the MOST important to review when conducting a business continuity audit? A. A hot site is contracted for and available as needed. B. A business continuity manual is available and current. C. Insurance coverage is adequate and premiums are current. D. Media backups are performed on a timely basis and stored offsite.
IS auditors who have participated in the development of an application system might have their independence impaired if they: A. perform an application development review. B. recommend control and other system enhancements. C. perform an independent evaluation of the application after its implementation. D. are involved actively in the design and implementation of the application system.
A data administrator is responsible for: A. maintaining database system software. B. defining data elements, data names and their relationship. C. developing physical database structures. D. developing data dictionary system software.
A single digitally signed instruction was given to a financial institution to credit a customer's account. The financial institution received the instruction three times and credited the account three times. Which of the following would be the MOST appropriate control against such multiple credits? A. Encrypting the hash of the payment instruction with the public key of the financial institution. B. Affixing a time stamp to the instruction and using it to check for duplicate payments. C. Encrypting the hash of the payment instruction with the private key of the instructor. D. Affixing a time stamp to the hash of the instruction before being digitally signed by the instructor.
Which of the following would an IS auditor place LEAST reliance on when determining management's effectiveness in communicating information systems policies to appropriate personnel? A. Interviews with user and IS personnel B. Minutes of IS steering committee meetings C. User department systems and procedures manuals D.Information processing facilities operations and procedures manuals
Which of the following steps would an IS auditor normally perform FIRST in a data center security review? A. Evaluate physical access test results. B. Determine the risks/threats to the data center site. C. Review business continuity procedures. D. Test for evidence of physical access at suspect locations.
When developing a risk management program, the FIRST activity to be performed is a/an: A. threats assessment. B. classification of data. C. inventory of assets. D. criticality analysis.
After implementation of a disaster recovery plan (DRP), pre-disaster and post-disaster operational cost for an organization will: A. decrease. B. not change (remain the same). C. increase. D. increase or decrease depending upon nature of the business.