Answer / mpatil
Hi,
Audit process is nothing but assesment of your project to
ensure if the project is going smoothly and team is clear
with what needs to be developed/tested...
In my company audit will happen sometimes seperately for
Dev & Qa and sometimes combined...
Requirements for the Dev Audit meeting:
•Project Plan
•Project requirements document(s)
•For requirements not available in requirements document –
a confirmation from Project Manager (should be avoided)
•Technical Impact Analysis / High Level Design / Low Level
Design documents (as required)
•Interface requirements document (IRD)
•Code review results (as required)
•Unit Test Objectives and Scripts with Traceability
•Integration Test Objectives and Scripts with Traceability
•Release Notes and Promote-to-Production (PTP) documents
Requirements for the QA Audit meeting:
•Project Plan
•Project requirements document(s) – All requirements have
to be available in requirements documents – No exceptions
•System Test Plan
•System Test Scripts with Traceability
The auditor may ask questions to the team what was their
understanding on the requirement, how did they
implement/test and what strategy did they follow?. PSO team
members will also be present in the Audit who will note
down everything and finally send out the project health
status to the concerned people.
guys, please let me know if anything else is missed out...
| Is This Answer Correct ? | 8 Yes | 3 No |
prepare functional requirements and design test cases for a given business requirement as follows(consider all the implicit requirements): A message portal is given,Login into that, check for any e_mail in inbox-if present reply,if not compose a mail and send it.
Interface Testing means?
What does the test strategy include?
What is binary portability testing?
How many defects is acceptable for a project. Is there any goal for no. of defects.
3 Answers FIC, MinMax Software,
Why we do load and performance testing?
Can anyone pls tell me how to do action parameterization (input and output parameters) with respect to login window and insert order of flight reservation window in detail( pls give a clear step by step explanation with example) anyone please
I. Policymaker II. Technical specialist III. Project manager IV. Software development manager The personnel listed above represent a partial list of candidates for the configuration control board (CCB). In addition to software QA and software CM, which of these personnel should be included on the CCB? 1. II and IV 2. II 3. II and III 4. I and II 5. I, II, III, and IV
how to retrive only second row from table in sql server 2000?
Can you help me with your suggestions so as to select a test management system that fits perfectly well with the two widely used software development methodologies i.e., agile and waterfall?
Case Study:-Given a standard calculator with the basic functionality of addition,substration,multiplication and division-write the test case to test this and tell how did it take to write the above test case and how ling would it take to execute them?
Explain what is mr and what information does mr consists of?