In a theatre having capacity of 800 divided into three.
capacity of first is 270, capacity of second is 190 more
than third. find capacity of second.
Answers were Sorted based on User's Feedback
Answer / vaibhav
270+190+x+x=800
2x=800-460
2x=340
x=170
that a=270
b=170+190=360
c=170
Is This Answer Correct ? | 20 Yes | 0 No |
Answer / brijit auxsheelia
the answer is 360.
let a+b+c=800.
a=270(given);b=c+190;c=unknown;
so,270+c+190+c=800
(i.e)340+2c=800 which gives c=170.
so,b=C+190=170+190=360.
verification:170+270+360=800
Is This Answer Correct ? | 17 Yes | 0 No |
Answer / rejith vr
First Section = 270
Second + Third = 800 - 270
= 530
second = third + 190
average of first & Second = 530/2
= 265
Difference between Ist & IInd = 190
ie second = 265+(190/2)
= 360
ie third = 265-(190/2)
= 170
Is This Answer Correct ? | 1 Yes | 0 No |
What feature of the waterfall model distinguishes it from other models
What is platform-driven design?
Describe your design ability ?what is your Architecture design GPA as it compares your general GPA?
Can you explain why software is called a product?
Write a command to find all of the files which have been accessed within the last 30 days. Output should be stored in a file “December.files”
What is Make to Order, and what is the difference between Make to order and Make to Cash
what do you mean by Foreign exchange domain
How would you create a footprint in your PCB designer software (say, Altium)?
One of our potential future investors ask us for following: "We also wanted to see the high level algorithm diagrams". I have searched the Web a lot and have found a lot of types of diagrams. I will not list them here. I'm not sure that the definition "high level algorithm diagrams" exists at all. Any way, if you know it is - where I can find it on Web. The more general question. If one need to create (let us define it this way) high level algorithm diagrams - where to find types, descriptions and templates on Web. Thanks a lot. Valery
vendor out going payment suppose is 10000/- and after some time vendor returned 2000/- as it is excess where this transaction to be posted in fi/ap
what is another name for Spiral SDLC?
In a 100 day project how much time would be spent on requirements capture.