How will you give estimation when preparing Test Plan
Answer / praveena
estimation is done based on the requirements.
first we will analysis the requirements and write scenarios and test cases.now the actual count starts i.e.,time required for external review, interner review, time required to execte each test case, time required for re testing. The total time is used to give estimation.
Actually 70% of estimation is done by developers and only 40% is done by testers.
| Is This Answer Correct ? | 5 Yes | 1 No |
Which is the best book to ref. for design the test cases/scenario in manual testing,which gives detailed idea with all the strategies ?
work break down structure in manual testing
Meaning of Web Application. my doubt is www.yahoo.com .it is web application?
1. What is the difference between Build Management and Release Management ? 2.When will conduct build verification and end to end testing?
what is the need for testing?
If PRS is given to you on say XYZ functionality then which different types of testing you will perform . Please arrange these types in sequential manner in which you will perform?
What is an inspection in software testing?
What is the difference between Functional test cases and UAT test cases?
Being an Manual tester, what will be the role or activity in test plan ?
what is the need to write testcases??? cant u test ur application with SRS?? y u have to write testcase document??
Differentiate defect life cycle and test cycle.
today evening you need to release software to client.at that time you found a defect.How you convence him?