In waterfall model, while your are coding if you happen to
know that one of the requirement was wrong and there will
be no use in implementing it and moreover it is going to
cause problems to the final output. Then do you have the
flexibility to go back and change the requirement?
Is this flexibility there in Vmodel?
Answers were Sorted based on User's Feedback
Answer / amrita
No in waterfall model its not posible to go back to previous
stage.............if we found any bug or error..............
yes in V Model its possible..................
| Is This Answer Correct ? | 6 Yes | 1 No |
Answer / tushar nagarkar
No the basis of waterfall model is to go through all the
steps of SDLC but does not allow to go a phase back....
However real time scenarios may differ but for the
question's sake lets take the answer as NO
| Is This Answer Correct ? | 5 Yes | 1 No |
Answer / qaprofessional
I think its not possible, as both these are sequential
models! As stated you have started coding, so the design are
completed and the test cases have all been prepared.
| Is This Answer Correct ? | 0 Yes | 1 No |
what is the difference between smoke, sanity and dry run testing?
can u explain me v-model?I told him we will do parallely both devolpment and testing . frs------------useraccepatance testing \ / srs system testing \ / HLD integration testing \ / LLD--------------------- unit testing \ / CODING he asked me how ur frs is done parallel with useracceptence testing and srs is done parallel to system testing and HLD IS done parallel to integration testing and LLD is done parallel to unit testing.Give me a clear clarification for it?
could you sent me boundary value analysis sample test cases
what is a test case?
what are the testing methodologies?
6 Answers GE, Infosys, Patni, Wipro,
What is a Test Strategy and the basic test strategies? What is a Test Methodology and the basic test methodologies?
what is Difference between entry criteria and exit criteria ?
Hi Friends, I have recently completed Testing course and planning to apply for jobs, I am Planning to put Banking Project in my resume but b4 that I need your help guys According to my knowledge in the banking project basically it contains 3 modules say 1. Banker 2. Admin 3. Customer Could you please explain me in terms of interview like how to explain each module and what exactly each module does and what type of testings we can do on banking project. Any help would be appreciated Thanks in advance Swapna
what is meant by beta testing?
how many functional testcases u can write for triangle
Hi everybody. In an interview i was asked to write the ECP for the range (1-10).
Generally how do we do DataBase testing in Manual testing.. Do we prepare any testcases.. Generally do we concentrate more means ex: Joins, Triggers.....Anybody can expalin it in detail..Thanks in Advance....