In waterfall model, while your are coding if you happen to
know that one of the requirement was wrong and there will
be no use in implementing it and moreover it is going to
cause problems to the final output. Then do you have the
flexibility to go back and change the requirement?

Is this flexibility there in Vmodel?

Answer Posted / tushar nagarkar

No the basis of waterfall model is to go through all the
steps of SDLC but does not allow to go a phase back....
However real time scenarios may differ but for the
question's sake lets take the answer as NO

Is This Answer Correct ?    5 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Test approach to windows update?

1735


Hi , Please send me the interview questions which were asked in manual testing mainly the test cases asked to write in interview.

1499


What is the Diff between Code Walkthrough & Code Review? What is the diff between walkthrough and inspection? What is meant by GUI Testing?

1570


What is Snapshot Testing? When we need to do and who will involve in this process and also what is the output document of this testing

2408


What criteria would you use to select Web transactions for load testing?

1641






How do you perform configuration management with typical revision control systems?

1644


Why is it impossible to test a program completely?

969


what is configuration management tool - send to thanu_santo@rediffmail.com. what is testing senarios

1729


What is Batch testing? Facets Benefit Configuration

2153


what are the test bugs

1494


what is diffrence between dynamic black box testing and dynamic white box testing

1564


how do u manage scripts in winrunner when you application is changing frequently?

1485


how will you test a wine filled bottle along with 100 glasses

1864


Write notes on apparel testing equipments.

768


What is Test Design ?( Urgent) and Test Design for Printer?

1563