If it is possible to test 5000 vuser through single machine? Then how you can test? plz explain
Answers were Sorted based on User's Feedback
Answer / pavan
Yes, it is possible, but you need following items,
1) 5000 vusers licensed version
2) The system configuration should be good, like p4 or more
3) Proper virtual user script,
If you have all the above requirement you can do the
test with 5000 usrs
| Is This Answer Correct ? | 1 Yes | 1 No |
Answer / sachin
In addition to above requirements u must have a internet
connection with a very good speed if u are testing some
websites.
| Is This Answer Correct ? | 1 Yes | 1 No |
How will you handle the situation in scripting where for your mailbox you have to select any one mail randomly to read?
differance between "lr_output_message" and "lr_error_message"?
Application Description: My current Project is a .net application & has Active X components also implements AJAX technology for report generation. Flow : A report has to be generated as soon as the preferences have been selected. Issue With Web(http/html) protocol in LR 8.1.4 and LR 9.1: Replay snap shot doesn't show any screens except the login screen(junk data is displayed instead of Reports)..And the last snap shot has "session expired" messsage. Issue with Web(click and Script) Able to record and replay sometimes...but no consistentency. Couldn't execute the script in the controller due to this incosistency. Any suggestions would be really helpfull.E-mail me for any further clarifications/information.
How do you estimate the transaction mix / VUser mix in LoadRunner?
types of servers?Explin me plz(chandana)
)In which way we can say html recording mode is best over the URL mode to record the script in Vu gen?
What are the main Performance issues in JBoss server? And How to do it?
What Component of LoadRunner would you use to record a Script?
Which protocols are supported by loadrunner?
)What r pre settings while recording a script?
what are the objectives of performance testing?
I need to perform a 4hr test run in performance center 9.0 there i need to rampup 10 users after 1 hour. I selected the run tab and added users to down state -> Ready state-> initialise-> Run state. 10 users ramped up successfully for the next 1 iteration only after that the 10 users automatically goes to the stop status. But i want the ramped up users to be carried out for the next 3 hours. Please help me out how to do the rampup successfully for the remaining time period.