sir i want the book for managerial aptitude for apsrtc
jobs.if u know send to my mail arun9risingsun@yahoo.com
Answers were Sorted based on User's Feedback
Answer / shankar
sir i want the book for managerial aptitude for apsrtc
jobs.if u know send to my mail id khanna000@gmail.com
| Is This Answer Correct ? | 5 Yes | 2 No |
Answer / a.sreenivasulu
Sir, in preparation of TST exam, please send me the
previous/latest question papers or model papers,meterial and
and any type of information.
| Is This Answer Correct ? | 3 Yes | 1 No |
xy-x+2y = 6 equation is shifted to form equation xy=c what is c?
fridge cost R Rs,cover value is 5,discount d% then its new cost?
A farmer built a fence around his 17 cows, in a square shaped region. He used 27 fence poles on each side of the square. How many poles did he need altogether?
I have 125 maths questions fully answered with detailed explanation for bank clerk test. Since I paid for it, if you are ready to share the price, I can share it with others just for Rs.50. If interedsted, mail me:beenasbi@gmail.com
1 Answers Medical Solutions, State Bank Of India SBI, Texmo,
A person was fined for exceeding the speed limit by 10mph. Another person was also fined for exceeding the speed limit by twice the same. If the second person was travelling at speed of 35mph . Find the speed limit ?
6 Answers Accenture, Asha Chemicals, TCS,
Given a triangle ABC, how would you use only a compass and straight edge to find a point P such that triangles ABP, ACP and BCP have equal perimeters? (Assume that ABC is constructed so that a solution does exist.)
If the vertex (5,7) is placed in the memory. First vertex (1,1) ?s address is 1245 and then address of (5,7) is ----------
1 Answers Accenture, BSNL, TCS,
If it costs x dollors for making certain item if quantity is 1000 and if quantity increase then the item is made using y dollars. If z number of items are made which are greater than 1000 then what is the total cost.
6 Answers College School Exams Tests, Samsung,
1. Questions on probability 2. Questions on statistics (mainly growth rates, market shares, etc.) 3. Questions on general logics 4. Evaluate strengths and weekness of proposed product All questions are open test
1 Answers DEK, Nielsen, SP Jain, TMR,
A company figured it needed 37.8 sq.feet of carpot for its reception room. To allow for waste, it decided to order 20% more material than needed. Fractional parts of sq.feet cannot be ordered. At Rs.9/- a sq.feet, how much would the carpet cost?
Raghav marks his product 25% above the cost and then gives a discount of 20%.If the original price is Rs,25000 What is the final price?
A man covers 27 kms in 9 hrs and return home with a speed of 5 km/hr.what is his average speed for entire journey?