can we do iterative testing in v-model?
Answers were Sorted based on User's Feedback
Answer / muyeen
No as per my knowledge Iterative testing is not possible
because in V-Model both the development and Testing
activities carry on simultaneously. Iterative testing can
be done on Prototype Model
| Is This Answer Correct ? | 1 Yes | 4 No |
Should testing be only after build and execution?
What are joins and subjoins in the data bases what is data driven testing what is verification and validation What is Quality Assurance (QA) and Quality Control (QC) Is Verification is related to QA and Validation is related to QC ? which type of model you follow basically in your project what is a use case How to test a Bike how to test a Lift (Elevator). which configuration Management tool do you use which Bug tracking tool do you use explain Bug life cycle what is Regression testing what is ALPHA testing ans BETA testing What types of testings comes under Non functional testing what is TEST DIRECTOR what is CMM and CMM i whar are Expressions in Winrunner What is a Compile module Is it Necessary to open the tool first or the application first after getting a bug what will you do if you add a new object or a new module for the existing application then how will you test the application which Defect tracking tool do you use what is change management What is smoke Testing what is sanity testing A application is given to you but the requirements and functionalities are missing what will you do to start the testing which testing documents will be received by the client
what is the different between QA and test engineer?tell me in brief?
What are the review documents used for testing?
usecases are prepared by whom?
what is localisation &globalisation
What is Online gaming, payment gateway development, hosting and custom software development services.
what is difference between win 98 and win 2000 poertating system?which is better one?
What is an end-to-end testing?
Please recommend which are a good books for software testing.. best authors for s/w testing.
I attendend written test in NDS bangalore in aug 2009. 20 aptitude and 10 descriptive questions. In aptitude they ask sums from time and work,time and distance,tap,feet and inches(12 inches=1feet),percentage etc...
please send me database stored procedure checklist.