Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Electrical Engineering Interview Questions
Questions Answers Views Company eMail

what ll happen if neutral is not shorted with phases while doing transformer short circuit test & what ll happen if neutral is connected to ground?

1 3867

a. void main() { char a[6] = "INDIA"; while(*a) { printf("%c",*a); a++; } } 1. india 2. I N D I A 3. no output 4. error 5.Null

1 11612

c. int m = 10; main() { int m = 20; {int m = 30;} printf("%d %d",m,::m); 1. 10 10 2. 10 20 3. 20 10 4. 20 30 5. 30 20 6. None

2 5826

what is difference between isolation and ultra isolation transformer?, what is the method of testing ?

4290

Can we step up a 230V supply to 400V using a single phase transformer??

2 6980

it is possible to run 130V AC and 230 V AC cables run in same tray

2 4652

what is sevice settings for mccb?How can be it setted?

1 4181

How can I indicate rpm on digital rpm meter with help of simple tacho output? tacho output is 90v at 3000rpm.

Godrej,

2 4032

WHY DOES NEUTRAL DO NOT CARRY EVEN THOUGH IT CARRIES RETURN CURRENT?

3 6043

WHAT IS METHOD TO DESIGN SIZE OF A 11KV UNDER GROUND CABLE FOR A OUTGOING FEEDER FEEDING 6NOS 250KVA TRANSFORMERS WITH 5KM LENGTH OF FEEDER?

1 3438

why should be the frequency is 50 hz only why not others like 45, 95 56 or anything , why should we maintain the frequency constant if so why it is only 50

3 7263

How to find the maximum load that can supply by a particular(say 315kva) KVA rated transformer?

ME,

2 4886

How to find the maximum load(in KW)in a big industry, having motors,lights,lifts etc..?

ME,

2 5015

How to find the maximum load, that can be supplied by a transformer.....

ME,

2 5541

mccb service sittings be done?

1902


Post New Electrical Engineering Questions

Un-Answered Questions { Electrical Engineering }

what is different between phase and netural

1929


Is RTCC panel needs any control supply.

1999


5- What is the task (function) of the excitation and isolation transformers in power plant? 6- What is the task (function) of LCI (A), LCI (B) and LCI (COS) in power plant? : LCI (A) and LCI(B) are load commutating inverter for generator turbine starting. , LCI (COS) is load commutating inverter change over switch

3764


Load break swicth maintenance procedure.

1714


WHAT IS ELECTRICAL MAINTAINTENCE ?

2030


what is self capacitance of inductor

2381


Usually in the L & T make MCC feeders' power circuit,we have BMR after the MAIN CONTACTOR.,can we interchange their position, keeping the control logic same???

2067


how to choose cable size with respect to load? how to convert cable size in mm2 to sq.mm?

5885


can u tell me the promotion from oiller to enginer

1892


what is gas turbine intercooling ?

2048


Discuss about gear cutting machines.

1171


Sir,In our company there are 3 caterpillar make(capacity:(1) 3.3KV,2.5MW(2)3.3KV,2.5MW & (3)3.3KV,1.9MW) & 1 deutz make (capacity:11KV,3.8MW)gas engines utilised,all are running in paralell. There are three transformer utilised,(1) 6.25MVA,3.3KV/22KV,Impedence voltage:6.7% used for two generator,both are 2.5MW(2)5.5MVA,3.3KV/22KV,Impedence voltage:7.2% used for one generator of 2.5MW & (3) 5.5MVA,11KV/22KV,Impedence voltage:7.8% used for one generator of 2.5MW.all generator breakers capacity of 1250Amps. Sir,I want the details of fault level calculation of generator,transformer individually & for whole system. If you require any information from me.feel free for contact me sir.pl.send the answer of my question as the earliest as possible.

2087


11 kv input, 66 kv input advantages

1352


What is the meaning of dedicated earthing?

2098


How to identify the start and end of 3phase 12 lead motor if U1, U2, etc numberings are lost or erased.

2105