The 3 phase Delta connection RB=440V, BY=350V,.......* is Line to Line voltage RY= ? And Formula....?
1149if there are six generators (3 gas CATT, one Jenbacher o1 MW each, and two nos Diesel 01 no 01 mw other 0.65mw EDGs ( say), 3 CAtt gas set have identical pole pitch,01mw EDG and Jenbacher gas Set have different pole pitch, how their power connection can be done to connect a common bus bar during installation. in short, how different pole pitched generators power connection can be done to connect a common busbar system through generators incomer ACBs.
1130i have gear oil pump with single phase motor.some time its motor starts running in reverse direction rather than forward direction...whats the reason behind this issue. 1- either capacitor is week? 2- or winding is week?
831Post New Electrical Engineering Questions
How much load can be taken for chiller from 1500 kva transformer
What will be the current if the resistance total in a series circuit doubles?
what are the protecyion of transformer & generators
What is meant by reset level of the relay?
what is doubling factor in making current of a breaker?
What are the main significances of root locus?
LT cable fault chaecking equipment and to find out the distance at what distence it failure . Name and where it is available?
What is a differential amplifier?
what is charger supervision and control supervision?
What are test values for an 63 KVA and 100 Kva Distribution Transformers for the following typical tests 1)Magnetic balance 2)Short circuit test 3)Open Circuit test 4)Vector group confirmation test .please give me the standard values for all the above tests.
We have 5 Distribution sections with variable loads&We have 3 Gensets(500kva,380kva&250kva) our total load is between 400kva to 600kva. so how could we connect 3gensets.
What is the vector group of a transformer,how can it be found out?
Why i receive the GCU fault in my DG Sychronization panel . what all the factors considered for this fault .
Draw a SLD of HT distribution EB grid up to users Transformer?
how can we make cable shedule for controll wiring ? which details must be required for it.?