How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?
1640Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
1775How much quantity of cement Bag for block masonry (1:4) for 1 cu.m? Block size (150x200x400) Mortar Thickness 20mm
1456How to calculate the cement consumption in RR Masonry in CM 1:8 for the foundation of Ground Level Reservoir
1501if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel
1378For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)
2010Post New Civil Engineering Questions
how to convert cement, sand aggregate quantity from M3 to kg with full description?
what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.
WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?
what is the coefficient for running feet to cft coversion both area and price
what is education Cess.
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
In the present situation of ban on mining sand from rivers,can we go for formation of earth dam filters viz;Horizantal sand blanket,inclined chimney and filters under rivetment with crushed rock sand of 6mm down size.If so what are the specifications and is there any codal provision for its authentication?
Sir how to find cutting length for footing steel bars in the shape of "u"
Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.
How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
Define What are the uses of alloys in daily life and how are alloys made?
insted of bentonite we can use any alternate material in piling ?
for pretensioning which will yield first and same for post tensioning?
how to do cementicious paint for rcc walls of cw pump house