How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?
1187Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
1272How much quantity of cement Bag for block masonry (1:4) for 1 cu.m? Block size (150x200x400) Mortar Thickness 20mm
1004How to calculate the cement consumption in RR Masonry in CM 1:8 for the foundation of Ground Level Reservoir
1031if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel
909For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)
1517Post New Civil Engineering Questions
What is the purpose of the gap in the road on this bridge?
Basic civil interview questions
why we provide bent up reinforcement bars at l/4 ? if it is because of diagonal shear , how does it acts ?
how much shouid be the rate for ready mix concrete per cubic meter
Slab quantity
What is thumb rule in quantity and cost estimation of a residential building?
Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?
Formula of area of crane hook
Please let me know what is the simplest way of Calculating Mix Designs
Why Should Curing Not Be Done By Ponding And Polythene Sheets?
In a concrete grade C35A, C & A stands for what and equalent cube strength?
how i get all type of short type question answer about civil engg
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.
what else we can add rather than admixture in concrete to reduce the cement quantity?