Civil Engineering Interview Questions
Questions Answers Views Company eMail

the plan area of a building 10*15 of superstructure 0.30 then plinth area is

1 448

what is the ration of the dummy columns which are to be dismantled in reconstruction for laying original columns

1 352

How to calculate ventonite bag in pile ( pile depth 25 m dia 1m)

281




Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??

255

Use of coping on terrace wall and in 4" wall is compulsory or not ?

177

What is thumb rule for deep trench excavation

300

how to calculate the cement, sand, coarse aggregate required for one cubic meter of concrete?

253

What is the density of DLC & PQC and how it is differ from normal concrete?

633




How much cum. Brick work can do by 1 madon

DLF,

237

Can we use the flyash bricks in brick bat coba?

214

how to calculate number of bitumen for road asphalt

223

Method of findingthe dry ingredient quantity of 1 m3 concrete. what is the difference between static and dynamic induced emf? Testing charges bill given for Rs. 32,000/- but not added service tax in this bill. So, How much TDS will be deduct

Suraj Constructions,

244

How many mortar required for Brickwork of 1 Cu.m works??

231

what is the calculation of raw material for 0.35cum of m-15

L&T,

222

1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.

NA,

327


Post New Civil Engineering Questions






Un-Answered Questions { Civil Engineering }

In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

912


can i get hindi version of is codes based on civil engineering?

3099


which are the Indian auther books for STONE COLUMN/GRANULAR PILES?

1049


what is the use if we fixed butterfly ties in column and masonry work joint?....where we have to fix(distance)..

1147


How to use of me trial wall plaster 6mm , 10mm par sqm. use in sand and cement ?

897






How to calculate laplength for 3 floors

607


how many minimum admixtures are used in water froofing structures

982


Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)

1041


What are your goals?

918


natucher of concrete &type of concrete?

1100


Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa

803


What ingredients with% found in ppc cement??

681


Test procedure of fly ash bricks as per code ?

1310


What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??

1185


How to calculate steel for beam slab and column

617