in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft
2111what are the grades of concrete?where and or what purpose a particular grade is used in a particular structure?
1638what is RFI.How to prepare for slabs and beams connecting works to be executed.give order of work to be done.
1806Post New Civil Engineering Questions
WHAT WII BE THE WATER ABSORPTION POWER OF WOOD ?
Rate analysis of 150mm, 100mm, & 230mm thk BBM work
Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.
whats is difference between anchorage length and development length
How to find CN by using arcgis 9.3?
The mixture of different ingredients of cement is burnt at?
cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?
to minimize budget cost of building , what can i do
For a washout valve why are two gate valves required in normal practice?
how we check the thickness and line of ceiling plaster.
how many monpower required for 1 sqm normal RCC structure ( includes finishes & MEP )
Prepare a Schedule for a Highrised building from starting stage to Handover?
How do you calculate the power of a centrifugal pump?
IS code for Rolling Margin of steel
How many axes do cartesian coordinate system has?