why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..
CST,
2563a rectangle grill of length 72 inch x 20 inch width.how to calculate bar spacing ,bar consist 8 mm thickness and spacing of bar is 2 inch.. calculate no of bar with formula
1627do you think we shall remove un wanted soil for foundation excavation even if the thickness of the soil strata is more than 8m ?
1642For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?
1926If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?
1664How we paste the Granite Slabs at External Wall?Is there any chemical compound material was using?
1 2804What is the Alternative material of cement, We use for Floor tilling and Wall tailing purpose?
1 3441Post New Civil Engineering Questions
material used for mendrel use to bend epoxy coated rebar
What is the maximum strength of cub compress strength in one cub testing
by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)
can any one tell me in detail footing estimation .. i am new here in dubai so facing lots of problem...
Critical Path Method is...
why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure
what is the tensile strength of 10swg and 8swg gabion wire?
if 20mm aggregate is coming by weight 25 ton in a 10 wheeler hywa ,then what will be total volume of aggregate in cubic feet.
CAN WORK WELL UNDER DEAD LINES OR PRESSURE?
Can we use the flyash bricks in brick bat coba?
What is the standard specification of MOR and Water Absorption of Homogenous Ceramic Floor Tiles?
in one SQM plaster how much Cement and sand consumed in ratio 1:4
how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?
how to find quantity of concrete in PCC M15
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?