What is the rate for RMC25 grade concreter in rs/cu mtr? What is the container capacity of RMC transporter in cu mtr?
2 5025if a 1 storey building is constructed without columns&beams and having the thickness of walls 12" in which cement&sand mortar is used what is the lifespan of building
1955If a 20 years old building without columns was going to renovation having a thickness of walls 12" is it Withstand the load of a new structure of having load of 1150k.g including live&dead loads?
1 3137Post New Civil Engineering Questions
what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.
how much required strength of cement concrete bricks(size 230x115x75mm)
how to calculate the scour depth
how much concrete solid/hollow block are manufacture per 50 kg cement bag in differnent sizes like 400x200x200mm, 400x200x150mm, 400x200x100mm. And need proper ratio as per sale quantity. pls send my mail mathi7599@gmail.com searching last two years not yet get pls find and enclosed pls. need practical analysis.
What are the different types of runners?
HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?
How to identify the vitrified tile and ceramic tile by observation only after executing the job.
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
How are freeway bridges built?
How many cum of 9.5mm stone in 1 ton ?
Scaffolding IS code NO.
Explain moment of inertia?
qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor
For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.
How to calculate steel for beam slab and column