Civil Engineering Interview Questions
Questions Answers Views Company eMail

Why is DPC not provided at sills of doors?

Simplex,

3 4063

How can we find out the clear cover for a circular ring and rectangular ring..

1 805

What is the cost difference between site mix and ready mix concrete per cubic meter

L&T,

628




why curing is necessary? Please explain it with detail

2 2358

what is the difference between highway and motorway?

596

what are the differences between Tie beam, Ground beam and strap beam. thanks

1 9912

How many square meter can mason layout chb per hour

831

Where do we use singly and doubly reinforced beam in construction purposes

Sterling Wilson, Isha Homes, Simplex,

2 2693




What difference comes in constructing of house and a housing complex like society

Sterling Wilson,

609

Generally construction is based on which method:limit state of working stress

Mars Planning Engineering Services, Sterling Wilson,

3 1996

60-70 grade of Bitumen is VG-30 ?

Sarthak Contracts,

697

how much steel provide in 1m cube r.c.c

3 3279

all rod lapping formula

3 3398

what is meant by workebility of concrete?i have studied about it much but i can't clear about it.so plz give me a detail explanation in simple english or urdu ?

1 1131

Currently how much cost are coming in residential building per sqm with material & Labour rate in Delhi,NCR

NICE,

1 1371


Post New Civil Engineering Questions






Un-Answered Questions { Civil Engineering }

how to calculate the weight of concrete

99


which method is used in semi-rigid connection design??

931


Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.

1357


What is the bowing depth after stressing of PSC Girder of various spans and various dia of strands?

916


how to calculate total cost for slab 35'×8'

708






Is there any course for billing available in Mumbai? If yes then please mail me the details..

853


I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

836


What type of tensile strength is handling by crank in beam? Thanks.

1199


What is chemical composion test

647


what is grade intersection?

814


Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.

803


hai, kindly send anyone for output workers format details for construction project in foundation to finishing.

208


in the earthquqke the profile of water on dam is parabolic or not

528


how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?

2448


i have four storeyed rcc building.basement of the building is around 34 years old.it does not have pillar support.it is having lintel steel support at every 7 feet of construction. how long this building will lost long . can any body help me in this regard

1027