what size of coarce aggregate we use for slab ,column,beam and footing?

3 11160

How many required water of 1m3 Brick masonary and slab casting?

Everest Bank, GVR, Vijay Nirman Company Pvt Ltd (VNC),

1 2141

How many required steel of 1m3 slab casting?

3 5755

how much cement and sand required for 100sqm of wall plastering in different proportions

Bharti, Pvr Constructions,

1801

Why sea sand and desert sand are dont used for construction

1 3860

Difference between ton and metric ton

DHA, ECCI,

3 5101

define quantity of each ingredient in 1:3:6 mix concrete by volume?

NJS, Pratibha Industries,

1594

what will be hook length of stirrups

Rawabi Fayfa,

7 7990

How to calculate volume of dry mix concrete?

1642

How to take measurement of plastering beam and column.

2 5995

what is density on steel bars?

AICL,

3 6789

what should be the minimum cross sectional dimensions of column for any given loads????

1 1797

What will be compressive strength of concrete casted in PPC in the 7 days period with M20 grade.

Pushkar Properties,

4 4489

what is the curing time for plastring (all)?

2 3907

How to calculate the design of column by simple method? 

L&T,

2 4487


Post New Civil Engineering Questions

Un-Answered Questions { Civil Engineering }

Define What is passive earth pressure ?

693


if dia of slab beam bar is38mm what its clear cover any method of provide clear cover

1644


How does siphoning work?

824


What is Grid floor and mention its advantages ?

2757


it is possiblee to produce concrete with out cracks...

1478






How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure

1771


How much wastages taken in 1. cement 2. steel 3. fine aggregate 4. coarse aggregates (10mm, 20 mm)

1388


Floor tile measurement? Wall to wall or skirting to skirting

1371


how to calculate the scour depth

2349


 Which Types Of Bricks ? 

2523


how calucate cement sand ratio for plstering

1507


As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.

1493


How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members. 

2857


Which are the top apps for you civil engineering?

684


how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing

1830