how many nails in 1 sq mitar

Nesters,

1 3408

How to calculate the number of reinforcing bars in a slab

NBCC, Aldowin Industries, THDC,

6 8038

ratio 1:4:8: for pcc. area 1008 cft. thickness 6' what is the quantity we need

2 2874




Formula for calculating the weight of ismc 75

2 10054

Soil is clay

L&T, NBCC,

2 3626

how to convert kg/m3 to cu ft

Ace Group,

1 1546

What is the allowable silt content for concrete works?

Sepco,

2 3226

What is the best mixture ratio in building a power plant? what is the weight of a 1 sack cement? what is the density of a cement?

CMC, Alfaraa,

1 4157




What is the proportioning by weight of 1:2:3 concrete mix design of cement, sand, gravel, and water in metric for a 3000 PSI concrete strength and a target slump of 75-100mm?

2 16541

Can we use Polystyrene as a Bitumen modifier !! if so is it a good MS research topic ? and what type of laboratory tests will be conducted during Research work ??

983

What is the Cement: sand: aggregate: water ratio for grade 30 (G30) concrete.

L&T,

2 12227

In 250x250mm cube, how much there will be cement,sand,water,and gravel

TATA,

4 5015

How do you measure the centring work

Puravankara, TATA,

4 10088

How to calculate material requirement for 230mm thick, 1 sq.m brick masonry?

Jindal, Secon, DLF,

4 8090

how much need sand and cement for 1 cft roof construction?

Indus Valley Construction IVCC,

3167


Post New Civil Engineering Questions






Un-Answered Questions { Civil Engineering }

manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.

503


What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)

869


how i can calculate the actual nos & size of steel to make 1000sqft. x 3"thick slab

1126


What are the disadvantages while using stone dust as filler in pavements?

1056


I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

837






How much quantity of cement and sand required for the inlining of 610mm dia MS pipe 8.7mm thk.Inlining thickness is 10mm and CM ratio is 1:1.5.

2237


How foundation is designed, Column design and beam design

1015


how much area can be platered by a mason for exterior

547


what is the basic difference between Coloumn & Shear Wall

803


what are the five benefits of using standard terminology in the measurement process?

634


Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3

442


how calucate cement sand ratio for plstering

641


what is your role of in previous company as a construction manager

783


how many spacers we need for 1 ton reinforcement? aprox.

2865


How much for the BRC lapping in full yield and half yield < and which table to get it ?