Plastering with cm 1:5 mix( one cement and five sand ) to 12 mm thick. How much Bag of Cement (50 Kg) and Sand (Cum)
4 16559how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step
2139What the advantages and disadvantage of using 90mm and 100mm bricks for a wall of a house? Thanks for any input.
1943Post New Civil Engineering Questions
material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water
What is the use of extruded feature in solidsworks?
How to find CN by using arcgis 9.3?
Will going from a 3-tap to 6-tap increase water pressure?
How much form and scaffolding per cubic meter volume of concrete class ''A'', ''B'', and ''C''
give me the rate analysis for Bituminous Macadam and SDBC
How to Rectify deep crack formed on Brick Wall? Explain the method of rectify the defect?
how lap length is increased with increase of Grade of steel?
at what pressure ply-wood is obtained by gluing wooden sheets
How to produce the Concrete Grade 30mpa at 12hour? How to prevent for plastic shrinkage crack? How can we produce fire resistant concrete?
pls tell me about method of cutting length of ties column
how we calculate the vol.of wet concrete..?
what is hydrostatic paradox?
Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa
can any one explain bar bending schedule of bems and columns and slabs ??