what is the salry which I am expect in kolkata for diploma in civil engineer with 3 years 6 month exp.???
6 9189if the length and breath of footing is 1.2m x 1.2 m what will be the length and breath of foundation trench
5 9603Post New Civil Engineering Questions
how to calculate the weight of concrete
How musch steel i.e. angles, channels,and square pipes are required per square feet for a steel roof of residential two storied building?
what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)
a butt weld is specified by
how can can column be corrected when the design is not safe ? is the increasing the clearcover a solution?
please briefly explain calculating or estimating steel quantity for a RCC column?
. Write a C program to perform following functions:- a. Declare one integer variable of all the storage classes. b. Print all the variables without assigning any values in tabular format. a. The tabular format must contain the variable name, type, storage class and printed value on the screen in RED color.
How do we calculate absolute pressure?
what is BPM in concrete demolition hammers. what is better a higher value or lower
how to balance aggregate during mix design of concrete???? how to calculate moisture content like C/A,F/A and how many percentage using ice instead of water for example of we are preparing ice concrete??????
Who built the sears tower?
how gradation of aggregates effect on slump of fresh concrete?
Prepare a Schedule for a Highrised building from starting stage to Handover?
how much is the maximum compressive strength of soil cement and soil-cement-microsilica .
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.