Civil Engineering Interview Questions
Questions Answers Views Company eMail

what is workability,define it?

1 4956

what is tensile strength?

4 7311

what is tensile strength?

3 6074

cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?

L&T,

1973

how to calculate result on Plate bearing test?

1 5247

what is the formula to calculate isolated footing

Supertech,

11 98655

how to start basic designing in structure..procedure to knw basic start to do structural designs in civil field?

2 4737

How to calculate paint drums per meter square

Speco,

2108

what r remedies taken for foundation in black cotton soils..??

1 4955

how many cement bags in 1m^3 cement concrete in all grade

Amara Raja,

8 12870

HOW TO MIX M20 GRADE CONCRETE BY HAND? USING BOND.

1 6479

difference between trapezoidal and pedestal footing and how the load acts on that

Golden Construction,

2423

What is the construction cost per sq foot for residential building and give bifurcation of same?

1 6581

How to determine dia of steel for use in column,slab etc. i mean how to calculate the diameter of steel which is to be used in structures.

L&T,

1881

What do you mean by TOLERANCE in steel

1 5620


Post New Civil Engineering Questions

Un-Answered Questions { Civil Engineering }

how i get all type of short type question answer about civil engg

1366


What is the density of 1:1.5 (Cement:sand) ratio in plaster? And Conversion in 12.5 mm thickness per square meter? Howmany Kg of Cement square meter in ratio of 1:1.5?

2985


what is difference between fluidity and workability also how palsticizer works

6842


Why should pumping be not used in case of concreting works?

1075


what are the Task work of different labour.?

2252






what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.

1993


what is floating slab foundation?

745


How to calculate concrete in percentage wise ,for example cement 18% sand 40% aggregate 40% and Stell 2% ,I need and??

1668


Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.

2473


what is the sequence of the activities in the typical under ground water tank including civil & MEP works.

2051


How to calculate the cement plastering for circular and rectangular water storage tanks and how to calculate the area of circular and rectangular floor?? Please help me

1559


do you think we shall remove un wanted soil for foundation excavation even if the thickness of the soil strata is more than 8m ?

1300


States some of the tool bars used in cad?

761


Which ratio use for cement selery???

1460


Explain the design for rcc multi-storied building?

775